C-12 CRUSHER
TOGGLE PLATE REMOVAL / REPLACEMENT Cont.
7:- Unscrew locking screw.
locking screw
8 :- Utilise screw as a valve handle &
push valve handle to release toggle plt..
9:- Stop the machine as described on
page 9.
10:- Lower existing toggle onto main
conveyor. - remove & replace with new
toggle plate.
14:- Pull back the toggle release valve
handle. This will then clamp the toggle
plate into position.
WARNING:-
a) Ensure ALL personnel are clear of
the machine BEFORE releasing the
jawstock.
b) Ensure that ALL guards are refitted
and that the feeder, crusher and
conveyor belts are empty BEFORE
restarting machine
.
15:- Remove valve handle and lock
back into position shown above.
17:- Adjust to the required closed size
setting as described on page 21.
relief valve
16:- Restart machine & press Jaw Lock
ON button, screw out relief valve until
accumulator pressure gauge reads
155 - 170 bar.
push
pull
12:- Raise new toggle plate into
position.
13:- Replace toggle support arm tie bar
& bush. (Note:- only one bolt shown)
tie bar & bush
Ignition Switch
11:- Examine toggle clamping & lift ram
bearings for cracks & damage due to
toggle replacement. Replace if necessary.
Bearings
Bearings
Bearings
38