77
RAW WATER SYSTEM
8.1 General
In the raw or seawater systems, the baitwell water
pump is mounted to a seacock on the thru-hull
fitting located in the stern systems bilge. The
water system pressure pump is connected to an
individual thru-hull valve. Always make sure the
ball valves are open before attempting to operate
any component of the raw water system.
Priming the System
Make sure the seacock valves are open and the
Raw Water switch in the helm switch panel is on.
Run the pressure pump by turning on the raw
water washdown hose until all of the air is purged
from the system and then turn the hose off. Turn
the Baitwell pump switch to the ON position and
run the baitwell pump until all of the air is purged
from the system and turn the pump off.
The intake for the baitwell centrifugal pump is
equipped with a scoop and ball valve. If the pump
runs but will not prime make sure the valve is
open. If the pump still won’t prime, it may be air
locked. Make sure the valve is open and run the
boat at or above 15 M.P.H. The water pressure
from the scoop will force the trapped air through
the pump and allow it to prime. If this procedure
doesn’t work, contact your Everglades dealer.
Closing the thru-hull valves before the boat is
hauled from the water will help to eliminate air
locks in raw water systems. The valves should
also be closed whenever you leave the boat un-
attended.
Notice:
It may be necessary to reprime the raw wa-
ter system if it is not used for an extended
period and at the time of launching.
8.2 Raw Water System Operation
A high pressure pump, controlled by a pressure
sensor, is activated by the Raw Water switch lo-
cated in the helm switch panel. When activated,
the pressure switch will automatically control the
pump that supplies the raw water hose connector.
Chapter 8:
275/295 Center Console
Baitwell Supply Pump and Seacock
325 Center Console
Seawater Supply Manifold and Seacocks
Baitwell Supply Pump and Raw Water Pressure Pump
As the pressure builds in the system, the pump
will shut off. When the system is in use and the
pressure drops, the pump will turn on. The water
system is equipped with a strainer on the intake
side of the pump. The strainer should be checked
frequently and cleaned as necessary.
Whenever the boat is left unattended, the Raw
Water switch should be placed in the OFF position.
Summary of Contents for 2012 275 CC
Page 1: ...2012 Owner s Manual 275 cc 295 cc 325 cc ...
Page 2: ...2 Revision 1 10 24 2011 ...
Page 18: ...18 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 24: ...24 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 27: ...27 Operation ...
Page 40: ...40 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 54: ...54 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 76: ...76 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 80: ...80 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 110: ...110 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 124: ...124 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 125: ...125 SCHEMATICS Appendix A 275 295 Center Console Wiring Diagram ...
Page 126: ...Schematics 325 Center Console Wiring Diagram ...
Page 131: ...131 MAINTENANCE LOG Appendix C Hours Date Dealer Service Repairs ...
Page 132: ...132 Maintenance Schedule and Log MAINTENANCE LOG Hours Date Dealer Service Repairs ...
Page 133: ...133 Maintenance Schedule and Log MAINTENANCE LOG Hours Date Dealer Service Repairs ...
Page 134: ...134 Maintenance Schedule and Log MAINTENANCE LOG Hours Date Dealer Service Repairs ...
Page 135: ...135 Maintenance Schedule and Log MAINTENANCE LOG Hours Date Dealer Service Repairs ...
Page 136: ...136 Maintenance Schedule and Log MAINTENANCE LOG Hours Date Dealer Service Repairs ...
Page 137: ...137 Appendix D BOATING ACCIDENT REPORT ...
Page 138: ...138 Boating Accident Report ...
Page 139: ...139 Boating Accident Report ...
Page 140: ...140 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 142: ...142 THIS PAGE WAS LEFT BLANK INTENTIONALLY ...
Page 147: ...CAUSE AND SOLUTION ...
Page 148: ...Everglades Boats 544 Air Park Road Edgewater Florida 32132 ...