Chapter Five
Debugging Instructions
System commissioning
After the wiring is completed, please refer to the AS1 series manual for system
operation.
Note:
Turn on the battery switch and BMS switch when using the B1 battery.
4.5 Ground Connection
After penetrating the external hex head screw through OT terminal of the grounding
line, screw in the grounding port of inverter enclosure in clockwise direction and
make sure it is secured tight.
Figure 4.5 Ground Connection