4.4 Install the right cover

Lock the cover with the original M4 screws. 14kgf.cm (torque) is recommended. 

Chart 4.3 Explanation to Pins of Communication Interfaces

Figure 4.4 Lock the Right Cover 

Code

Name

1

Blank

2

Blank

3

Blank

4

Blank

5

Blank

6

Blank

7

RS485A

8

RS485B

Attention

•   Use the original cable that matches to the battery.
•  Do not connect one B1 battery to two inverters at the same time.
•  The waterproof sheath must be tightened after wiring to prevent rain  
 

water from entering the interior of the battery.

Summary of Contents for B1-5.1-48

Page 1: ...I www solarsg com au USER MANUAL User Manual B1 5 1 48 Secondary...

Page 2: ......

Page 3: ...Package Items 3 2 Installation Position 3 3 Mounting Procedures Chapter Four Electrical Connection Ways 4 1 Explanation to Electrical Interface 4 2 Connection ways to Secondary 4 3 Communication Inter...

Page 4: ...ttery near flammable explosive items or open flame Do not immerse the battery in water or install it in a humid environment Warning The installation maintenance recovery and disposal of batteries must...

Page 5: ...rsonnel No open flames Install the battery away from inflammable and explosive articles or gases Danger of hot surface During operation internal components of the equipment will release heat Do not to...

Page 6: ...ical treatment 2 If the battery liquid accidentally contacts the skin scrub and clean it with soap immediately 3 If you inhale gas and feel unwell dizzy or start vomiting seek a Doctor straight away 4...

Page 7: ...ischarge of the battery Modular design is adopted for the battery to facilitate installation and wiring Three units of batteries at most can be paralleled Chapter Two Product Introduction 2 1 Products...

Page 8: ...90 Cycle Life 6000 Max Charge Current A 60 Max Discharge Current A 60 General Parameters Battery Type LiFePO4 Communication Ways CAN Operating Temperature Range 0 C 50 C Cooling Method Natural Convec...

Page 9: ...solarsg com au USER MANUAL Chapter Three Installation Instructions 3 1 Package Items Battery pack Mounting Bracket Mounting bolts for mounting bracket 6 Cables Bolts 4 Ethernet cable EJ45 plug User M...

Page 10: ...8 3 2 Installation Position 3 2 1 Battery size 3 2 2 Installation Position This equipment is cooled by natural wind convection Fig 3 2 1 B1 5 1 48 Secondary Dimension Unit mm...

Page 11: ...imum backward inclination of 15 degrees Horizontal or reverse installation is not allowed MAX 15 Make sure the install location is well ventillated or else the work performance of internal electronic...

Page 12: ...from center to install Unit mm Make sure that the wall is strong enough to fix the screws and bear the weight of the equipment before installation Mark the position of the mounting hole of the bracke...

Page 13: ...the installation distance between the Primary bracket and the Secondary bracket and the distances among Secondary brackets should meet the following requirements of at least Fix the brackets in the m...

Page 14: ...them in case the distance is not wide enough for the installation After the mounting bracket is installed hang the equipment on the mounting bracket carefully and ensure that the bottom of the equipm...

Page 15: ...the Primary During the installation of the project it is necessary for installers to consider whether to reserve an installation location for the subsequent addition of battery packs If needed please...

Page 16: ...nation Chapter Four Electrical Connection Ways 4 1 Explanation of Electrical Interface Code Name A BMS switch B Battery switch C c BAT port D d BMS LINK port E e BAT port F Ground Figure 4 1 B1 5 1 4...

Page 17: ...t the cover aside by the equipment Remove the flange nut head in a counter clockwise direction and remove one plug as shown in the picture left below After that wire the original cables through to the...

Page 18: ...on Interface Take out the original uncrimped Ethernet cable wire it through the waterproof jacket and then crimp the RJ45 plug of the cable Figure 4 2 3 Connection diagram Figure 4 3 Pins of RJ45 Cabl...

Page 19: ...munication Interfaces Figure 4 4 Lock the Right Cover Code Name 1 Blank 2 Blank 3 Blank 4 Blank 5 Blank 6 Blank 7 RS485A 8 RS485B Attention Use the original cable that matches to the battery Do not co...

Page 20: ...stem operation Note Turn on the battery switch and BMS switch when using the B1 battery 4 5 Ground Connection After penetrating the external hex head screw through OT terminal of the grounding line sc...

Page 21: ...as 20 C 50 C humidity 85 RH 3 For long term storage 3 months please put it in an environment with a temperature of 18 C to 28 C and a humidity of 85 RH 4 The battery should be stored in accordance wi...

Page 22: ...au Warranty Card The installer should fill in the second form while installing the inverter For a warranty claim please complete the below forms and send this page to Eveready attached with the Custom...

Page 23: ...ing date Fault time Error message Display reading Brief fault description photo Signature Date Information on device For installer to fill in Modules used Modules per string No of strings Installer co...

Page 24: ...www solarsg com au...