6
ESW4 Closed Circuit Coolers
Assembly of the Top Section to the Bottom Section
Before assembling the top section to the bottom section, remove any loose parts shipped in the pan. Apply sealer tape as shown in
Figure 6 on page 5.
Wipe the flanges on the bottom of the top section. Check to see that the water distribution connection on the top section is in the
correction position relative to the bottom section (see certified unit drawing). Units are also provided with match markings on each
section (i.e. A1 of bottom section should match up with A1 of top section).
Lower the top section to within several inches of the bottom
section making sure the two sections do not touch and the
sealer tape is not disturbed. Using suitably sized drift pins to
assure proper alignment, lower the top section down onto the
bottom section.
Place nuts and bolts in all four corner bolt holes. Then continue
to install the rest of the nuts and bolts working from the corners
toward the center. Nuts and bolts must be installed in every
hole on the side flanges and end flanges. Cut off extra sealer
tape once the section is bolted into place.
Rigging the Top Section: Extended Lifts
The preferred method for extended lifts is to use slings under
the unit as shown in Figure 8. Spreader bars should always be
used between the cables at the top of the section to prevent
damage to the upper flanges or fan cylinder. Safety slings and
skids should be removed before final positioning of the unit.
See Table 3 on page 5 for minimum “H” dimensions.
H
“U” BOLTS
SPREADER
BARS
SAFETY SLINGS
Figure 8
– Proper Rigging Method for Extended Lifts
Figure 9
– Mating Upper Section to Bottom Section.
WATER
DISTRIBUTION
CONNECTIONS