
28937-01A
2
Installation - Pre-Installation Planning
Pre-Installation Planning
Before you begin to assemble your sunbed, you should observe the following consid-
erations.
• The
SOLARIS® 542
operates from a
220V AC power source. The unit
should be wired to a dedicated cir-
cuit capable of providing
50 Amp
service. This unit must be hardwired
directly to a junction box. We rec-
ommend connection by a profes-
sional electrician.
• This sunbed arrives with a ballast
tray stop bar installed to limit tray
movement (see below). To remove,
lift the bar, shift it to the left or right
and then pull it from the bed. After
the bed is assembled, reinstall the
bar to keep the tray from damaging
the access panel if the bed is moved.
WARNING
Shock hazard.
Disconnect power before
servicing.
Air from the room is used to cool the sunbed.
Maximum ambient room temperature should
be 80°F. Place your sunbed no closer than 6”
from any wall. Make sure nothing obstructs
the airflow into the sunbed’s endcaps or out
of the fan openings. A poorly ventilated room
may cause the unit to become hot and cause
discomfort to the user.
CAUTION
Use of a voltage source above 230V AC may
prevent proper operation of the sunbed and
could cause damage and void the warranty.
A buck booster transformer may be required
to alter voltage.
CAUTION
Proper assembly of your sunbed requires
three people. Plan to have a couple of
helpers assist you.
CAUTION