www.etsnord.com
8
RDM-59-0322
®
NORD
canopy
|
EOZ installation guide
Connect to the ventilation ducts
After the EOZ unit has been securely attached to the ceiling, connect the supply air and exhaust air ducts.
Note: Materials for the supply air side may be chosen at the discretion of the installer. However, all materials
used between the outlet of the EOZ unit and the main exhaust duct, including screws, rivets and the connecting
flange, must be stainless steel (AISI 316).
Secure the ducts with
stainless steel
rivets or sheet metal screws from both sides and ensure the connection
is airtight.