ETQ
EASTERN TOOLS & EQUIPMENT INC
Tel: (888)696-2345
Web Site: easterntools.com
Generator Location
Please consult your local authority. In some areas,
generators must be registered with the local utility.
Generators used at construction sites may be
subject to additional rules and regulations.
This generator must have at least five feet of
clearance from combustible material. Leave at least
three feet of clearance on all sides of the generator
to allow for adequate cooling,maintenance and
servicing.
Place the generator in a well-ventilated area.
DO NOT place the generator near vents or intakes
where exhaust fumes could be drawn into occupied
or confined spaces. Carefully consider wind and air
currents when positioning generator.
Grounding
The generator system ground connects the frame to
the ground terminals on the power panel.
The system ground is connected to the AC neutral
wire.
Surge Protection
Electronic devices, including computers and many
programmable appliances use components that are
designed to operate within a narrow voltage range
and may be affected by momentary voltage
fluctuations.
While there is no way to prevent voltage fluctuations,
you can take steps to protect sensitive electronic
equipment.
1.
Install UL1449, CSA-listed, plug-in surge
suppressors on the outlets feeding your sensitive
equipment.
Surge suppressors come in single- or multi-outlet
styles. They’re designed to protect against virtually
all shortduration voltage fluctuations.
2.
Obtain an Uninterruptible Power Supply (UPS)
device.
Most UPS devices come with a rechargeable
battery between the electronic equipment and
power supply source. The device buffers the voltage
and protects against virtually all shortduration
voltage fluctuations.
Starting the Engine
1. Make certain the generator is on a flat, level
surface.
2. Disconnect all electrical loads from the generator.
Never start or stop the generator with electrical
devices plugged in or turned on.
3. Connect LPG tube to the LPG tank, and then
open the LPG valve slowly, till it totally open (to
insure no LPG leakage).
4. Move the choke lever to the “Choke” position.
5. Press the denser bottom of the REDUCTOR
ASSY and hold 1
~
2 seconds;
6. Pull the starter cord slowly until resistance is felt
and then pull rapidly
7. As engine warms up, move the choke lever to
“Run”.
Connecting Electrical Loads
1.Let the engine stabilize and warm up for a few
minutes after starting
2. Plug in and turn on the desired 120 Volt AC single
phase, 60 Hz electrical loads.
Prohibit using CNG, NG or gasoline as fuel
.
DO NOT connect 3-phase loads to the generator.
DO NOT connect 50 Hz loads to the generator.
DO NOT overload the generator.
Voltage fluctuation may impair the proper
functioning of sensitive electronic equipment.
If the engine starts but does not run, make certain
that the generator is on a flat, level surface. The
engine is equipped with a low oil sensor that will
prevent the engine from running
when the oil level falls below a critical threshold.
?
NOTE
1. When using the LPG generator, please be
sure that there is some distance between LGP
tank and LPG generator, to prevent
unnecessary danger because of high
temperature surface of LGP tank;
2. When using the unit, please check the
surface temperature of LPG tank.
3.
请不要将
LPG
气瓶放置在
35
℃以上的环境下
使用
.
Summary of Contents for PG30P11
Page 20: ...Parts Diagram 25 9 ...