5 PREPARATION FOR INSTALLATION
5�1 Tools for installation
Assembly of mounting rail:
• 6 screws / 6 dowels
(depending on substrate)
• Cordless screwdriver / hammer drill
Perforating the insulating panel:
• Drill
Affixing insulating panels/grid heating
mat:
• Flexible adhesive
• Clay plaster
Installation of heating mat:
• Plastic nails, corrosion-resistant nails or (if
necessary) hot glue
5�2 Preparation for electronic thermostat
• A switch box at a height of approx. 140 cm.
must be provided.
• Insert the installation pipe for the connecting
pipe in the masonry.
5�3 Preparation of the substrate
Plasterboard or concrete:
• Primer or adhesion primer
is required.
Brick, H-brick or Ytong:
• Primer / adhesion primer not required.
19
19
DE
EN
FR
NL
IT