Installation
13
Mounting the spring pulls and lifting module
Mark all attachment points for the spring pulls on the
ceiling in the pellet store. Mount the eyebolts in the
ceiling and hook in the spring pulls.
Fig. 4-5: Installing the spring pulls
Mark the position of the lifting module on the ceiling
and fasten the rail centrally from this position. Thus, if
necessary, the position of the lifting module can still be
changed in the later functional test. The position of the
lifting module is shown in the plan.
Fig. 4-6: Rail for lifting module
Thread the lifting module into the rail.
Fig. 4-7: Threading in the lifting module
Fix the position with the locknuts.
Fig. 4-8: Locknut
Attaching the pellet hose to the mole
Place the pellet hose with the connected electric cable
in the pellet store. Align the pellet hose. First, the end
where the plug from the electric wire is located is
required.
Fig. 4-9: Plug from the electric wire
Summary of Contents for Mole E3
Page 19: ...Installation 19 ...
Page 32: ...www eta co at www eta co at downloads DOWNLOAD ...