background image

www.eta.co.at

www.eta.co.at/downloads

DOWNLOAD

Summary of Contents for HACK

Page 1: ...2017 06 12 EN 0000000379 V 001 93533 001 Replacing the combustion chamber HACK PE K 20 140 kW Installation...

Page 2: ...ETA Heiztechnik Gewerbepark 1 A 4716 Hofkirchen an der Trattnach Tel 43 0 7734 22 88 0 Fax 43 0 7734 22 88 22 info eta co at www eta co at...

Page 3: ...s Individual configurations depicted or described here are only available optionally In the event of contradictions between individual documents regarding delivery scope the information in our current...

Page 4: ...combustion chamber 20 140 kW The replacement combustion chamber consists of the combustion chamber stones and the associated seals Sizes 1 3 are built in the same way Only the size of the components v...

Page 5: ...y WARNING Switch off the electricity to the boiler via the mains switch Switch off the electricity to the boiler via the mains switch This prevents injuries caused by switching the boiler on inadverte...

Page 6: ...1 cm it secures the front combustion chamber stone Fig 3 2 Grub screw The illustration shows a boiler with the fuel discharge on the left side If the fuel discharge is on the right side the illustrati...

Page 7: ...n chamber stones The combustion chamber stones on the opening can be lifted with a suitable tool Due to the heavy weight of the combustion chamber stones in sizes 3 105 140 kW and 4 180 220 kW use a l...

Page 8: ...the integrated seals of the new combustion chamber stones for damage Insert the front and rear combustion chamber stones and slightly push them apart Insert the left and right combustion chamber ston...

Page 9: ...Installation 9 Re install the combustion chamber cover the cover and the combustion chamber door...

Page 10: ...www eta co at...

Page 11: ......

Page 12: ...www eta co at www eta co at downloads DOWNLOAD...

Reviews: