Page 1: ...2017 04 25 EN 0000000154 V 005 X 35 0 X 39 0 93053 001 ETAbox Speed with discharge screw 17 and 21 Operating Instructions...

Page 2: ...ETA Heiztechnik Gewerbepark 1 A 4716 Hofkirchen an der Trattnach Tel 43 0 7734 22 88 0 Fax 43 0 7734 22 88 22 info eta co at www eta co at...

Page 3: ...liability 4 2 Technical data 6 3 Installation room 7 3 1 General information 7 3 2 Sample 8 4 Information about pellet hoses 10 5 Installation 12 6 Configuration 19 7 Electrical connections 20 8 Commi...

Page 4: ...nce with this safety instruction there is a risk of physical injury DANGER On non compliance with this safety instruction there is a risk of major physical injury 1 2 Preface Dear customer Safe and sa...

Page 5: ...as long as they possess the required features and do not restrict the functionality of the system Proper installation The installing contractor is liable for proper installation according to the corre...

Page 6: ...00 x 2100 mm Height H adjustable in increments of 100 mm 1800 2500 mm 1800 2500 mm Height H1 700 mm 860 mm Height H2 1360 mm 1360 mm Distance between the filling nozzles D 500 mm 500 mm Storage volume...

Page 7: ...ic sack will become brittle over longer periods of time Attach dark film or transparent UV protective film to the window for example Protecting the fabric sack against damage Remove or cover pointy or...

Page 8: ...extraction unit of the ETAbox is to be set up so that the connectors for the pellet hoses are aligned with the boiler and easily accessible Orient the ETAbox so that the filling nozzles are accessibl...

Page 9: ...Installation room Sample 9 Required clearance for filling...

Page 10: ...ellet hoses Fig 4 1 Unroll pellet hoses instead of pulling them out Fig 4 2 Note bending radius Fig 4 3 Avoid twisting pellet hoses Fig 4 4 Use pipe guides or pipe supports Single piece suction hose T...

Page 11: ...cable near the pellet hose attachment nozzles No contact with uninsulated heating pipes The pellet hoses are designed for a temperature range of 15 C to 60 C so they may not come into contact with un...

Page 12: ...en with 4 screws M8 x 25 Installing the frame Set the feet to the required height This can be adjusted in increments of 100 mm To fix use 2 M8 x 60 screws and nuts each Then mount the 4 rectangular cr...

Page 13: ...edging Hook a hopper panel into the frame and hand tighten this with an M 8x 20 screw on the extraction unit Then hook the 3 other hopper panels with the edging offset see diagram onto the frame and...

Page 14: ...ighten all screws Installing the clamps Loosely attach 3 clamps to each cross bar with 2 M8 x 60 screws and nuts Preparing the fabric sack Fold up the underside of fabric sack facing outwards Thread i...

Page 15: ...n room Then hook the fabric sack into the frame Install each of the threaded cross bars with 4 M8 x 45 screws and nuts hand tight Fix the threaded pipe on the underside of the fabric sack with the cla...

Page 16: ...ck with bands so that no dust can escape during filling Attach the covers to the filling nozzles Also tie both side inspection openings for the filling level so that no dust can escape during filling...

Page 17: ...feet for this Attaching pellet hoses to the ETAbox On the ends of both pellet hoses free around 5 cm of copper wire from the hose and bend it inwards into the pellet hose Push both pellet hoses onto t...

Page 18: ...both pellet hoses onto the nozzles on the boiler and fasten them with the hose clamps Connect the copper litz wires from both pellet hoses to the yellow green earthing cable next to the nozzles Attach...

Page 19: ...ry and configured as pellet conveyor Standard screw Setting ETAbox with conveyor screw must be selected for the ETAbox with discharge screw Select the function block from the Selected function blocks...

Page 20: ...lug connections will be subjected to excessive mechanical strain In this case the warranty for the electronics would become null and void Only flexible stranded conductors may be used for the wiring C...

Page 21: ...tly lower than the gauged amount Low feed pressure during filling Set the feed pressure on the tank truck of the pellet feed to low so that the pellets are not injected into the ETAbox at too high a s...

Page 22: ...don t want to leave the burn back protection of our boilers to chance we equip all ETA pellet boilers with a rotary valve so that even during operation there is no open connection between the combusti...

Page 23: ...ing before filling 1 Switch off the boiler and power it off the mains switch This will prevent an accidental switch on of the pellet vacuum motor 2 Tap the outside of the fabric sack to dislodge the d...

Page 24: ...d power it off the mains switch This will prevent an accidental switch on of the pellet vacuum motor 2 Remove the cover on the extraction unit Behind this are 2 slits for the barrier plates Fig 10 1 C...

Page 25: ...assembly Clean the parts and remove them in accordance with the local regulations for workplace safety and environ mental protection Disposal Disposal including all components must be done in an envi...

Page 26: ...www eta co at...

Page 27: ......

Page 28: ...www eta co at www eta co at downloads DOWNLOAD...