16
www.eta.co.at
Concluding activities
Installation
To block, remove the maintenance cover from the
joint. The seal remains, however.
Fig. 5-9: Maintenance cover
Press the flue gas recirculation shut-off device into the
joint and tighten evenly with the wing screws.
Fig. 5-10: Install the shut-off device
The flue gas recirculation function must be
deactivated in the control system of the boiler
after installing the shut-off device. See the boiler's
operating instructions.
5.4
Concluding activities
Attach the panels
Remove the panel from the top of the precipitator.
Attach the cover with self-tapping screws onto the
boiler.
Attach the ash box
Attach the ash box to the precipitator.
Summary of Contents for EEP 130
Page 30: ...www eta co at ...
Page 31: ......
Page 32: ...www eta co at www eta co at downloads DOWNLOAD ...