background image

38

www.eta.co.at

Function block [handover module]

ETAtouch controller

10 ETAtouch controller

10.1

Function block [handover 
module]

Overview of the handover module

1

Operating condition and information.
A  description  of  the  operating  conditions  can  be
found in the integrated Help menu by pressing the

 button.

2

Current heat supplied (only visible when optional
heat meters installed)

3

Position of the district heating valve (100% = open)

4

Flow temperature of the secondary side

5

Heat transfer station consumer.
If the consumer is being charged (in this example
the  hot  water  tank),  a  line  appears,  and  the  flow
temperature and the symbol of the consumer are
shown in yellow.

6

On/Off switch for the heat transfer station

 = switched on
 = switched off

Function

The  heat  is  released  from  the  primary  side  heat
producer  (e.g.:  district  heating  network)  via  the  heat
exchanger to the secondary side consumer. The flow
from the heat producer to heat exchanger is regulated
with  the  district  heating  valve  (primary  valve),  which
regulates the heat volume.
The consumers, for example a heating circuit and a hot
water tank, are supplied with heat from the separately
regulated pump and the changeover valve on the heat
transfer station.

The primary valve opens as soon as there is a demand
from the consumers. The secondary pump starts after
the set delay has expired and supplies the consumers
with heat. If there is no demand, the secondary pump
is shut down and the primary valve closes.
To  protect  the  consumers,  a  maximum  flow
temperature as well as a frost protection limit can be
set.  Frost  protection  is  also  in  effect  if the  module  is
switched off with the On/Off switch 

.

10.1.1

Text menu - Adjustable parameters

10.1.1.1

Serial no.

Explanation of [Serial no.]

With  this  parameter,  the  serial  number  of  the  M-bus
meter is entered. This is needed for identification of the
connected  M-bus  meter  (heat  flow  meter  as  well  as
electric meter), so that the function block can read the
corresponding data of the meter.

If  in  the  serial  number  are  letters,  the  serial
number must be rotated while entering. Details to

this can be found in the manual of heat flow meter.
example: 1234 0A5678 => 56781234

The [Service] access level is required to perform
modifications.

The parameter can be found under:

10.1.1.2

Read out interval

Explanation of [Read out interval]

The interval for reading out the data of the M-bus meter
is entered with this parameter.

Too  short  an  interval  can  trigger  an  error
message on the M-bus meter. Refer to the M-bus

meter operating instructions for the shortest interval to
be set.

The [Service] access level is required to perform
modifications.

The parameter can be found under:

Inputs

Heat meter

Serial no.

Inputs

Heat meter

Read out interval

Summary of Contents for 939058-001

Page 1: ...2021 02 22 EN 0000000432 V 004 X 51 0 939058 001 Heat transfer station 15 75 kW Operating Instructions...

Page 2: ...ETA Heiztechnik Gewerbepark 1 A 4716 Hofkirchen an der Trattnach Tel 43 0 7734 22 88 0 Fax 43 0 7734 22 88 22 info eta co at www eta co at...

Page 3: ...tion 25 6 3 Circuit board GM C3 26 6 4 NT 10VA circuit board 28 6 5 Heat flow meter 29 7 Commissioning 30 7 1 Filling the heating system 30 7 2 Setting the flow rate 31 7 2 1 Primary side characterist...

Page 4: ...structions and information Layout of safety instructions SIGNAL WORD Type and source of danger Possible effects Measures for avoiding the danger Types of safety instruction CAUTION On non compliance w...

Page 5: ...roper installation according to the corresponding installation instructions and the relevant rules and safety regulations If you as customer have installed the heating system partly or entirely withou...

Page 6: ...tive 2014 35 EU Directive relating to electrical equipment designed for use within certain voltage limits Low Voltage Directive 2011 65 EU Directive on the restriction of the use of certain hazardous...

Page 7: ...valve with pressure independent flow limiter 6 Strainer for secondary side and connection for discharge 7 Actuator for primary valve 8 Strainer for primary side 9 Bleed screw for primary side 10 Safet...

Page 8: ...s for dimensioning Example Primary side Secondary side Network type Flow Return Heating system Flow Return 1 District heating network 90 C 42 C Radiators with or without buffer stor age tank 65 C 40 C...

Page 9: ...onnection to an existing ETAtouch control system A stand alone solution with a separate ETAtouch control panel is also possible Power is supplied via a 230 V Schuko socket The return temperature can a...

Page 10: ...tom Fig 4 1 Front cover Fig 4 2 Insulation Fit the wall mount with suitable screws and hang the heat transfer station in the mount Note the dimensions of the heat transfer station and the required cle...

Page 11: ...can be mounted properly Fig 4 6 Distance to the wall Mounting the connections Mount the connections for the primary circuit on the heat transfer station The return is equipped with an emptying device...

Page 12: ...led for the secondary circuit at the factory The outlet is already guided to the bottom of the heat transfer station in a pipe Connect the safety valve outlet to this pipe Fig 4 11 Safety valve outlet...

Page 13: ...ection for membrane expansion vessel For frost protection in the secondary circuit guide the safety valve outlet into a canister DANGER Safety valve outlet The safety valve outlet must be directed to...

Page 14: ...orrect for the measuring unit Fig 4 15 Measuring unit 5 The temperature sensors of the heat meter are colour coded flow red return blue Insert them into the immersion sleeves at the flow red and retur...

Page 15: ...ration with the assistant is provided in the document Control extension configuration The configuration of the individual examples is described subsequently Software version X 44 0 or later The config...

Page 16: ...n Settings Hydraulic variants Consumer with its own pump Options Module is a consumer within an ETA system Only select this option if the heat transfer module is a consumer in an ETA heating system Th...

Page 17: ...3 point control 230 V Room sensor Digital GM C 1 HWT Hot water tank Settings Charging pump Standard pump Flow mixing valve no Circulation pump No GM C 1 Sys System Settings Outside temperature sensor...

Page 18: ...control must be established Description GM C 1 Heat transfer station HOM Secondary flow S500 T3 Primary valve S6 Primary return S500 T5 System Sys Outside temperature sensor S501 T7 Hot water tank HW...

Page 19: ...Configuration Example 1 19...

Page 20: ...hin an ETA system Only select this option if the heat transfer module is a consumer in an ETA heating system This option may not be selected for stand alone operation e g as district heat ing station...

Page 21: ...er No GM C 1 Sys System Settings Outside temperature sensor via board input Show external malfunction message on the screen No Output all fault messages No Circuit board Function blocks Description Ci...

Page 22: ...to the second sensor Sensor 2 Thus greater thermal energy is available in the buffer for the fresh water module Levels in buffer Sensor assignment in buffer from to Boiler buffer producer Buffer top...

Page 23: ...blished Description GM C 1 Heat transfer station HOM Secondary flow S500 T3 Primary valve S6 Primary return S500 T5 System Sys Outside temperature sensor S501 T7 Buffer storage tank BufferFlex Sensor...

Page 24: ...ury and property damage Before beginning any work isolate the system completely from all power sources ensure that it cannot be switched back on and verify that it is safely isolated from the power su...

Page 25: ...n CAN bus connection to the ETAtouch control system The following example shows the CAN bus connection from the heat transfer station to the boiler s ETAtouch control This example applies accordingly...

Page 26: ...Pump S4 230 V output 3 x 1 mm Pump S5 230 V output 3 x 1 mm Pump S6 230 V output 4 x 1 mm Actuator for primary valve S7 230 V output 3 x 1 mm Pump S8 230 V output 4 x 1 mm Mixing valve S9 Supply exte...

Page 27: ...Speed for pump on terminal S3 S506 PWM output analogue output 2 x 0 5 mm Speed for pump on terminal S4 S507 PWM output analogue output 2 x 0 5 mm Speed for pump on terminal S5 S508A CAN bus 2 x 2 x 0...

Page 28: ...oard Terminal Function Minimum cross sec tion Standard assignment F2 Fuse 230 V T 6 3 A X1 Supply 230 V 3 x 1 5 mm Mains power input X2 230 V input Mains switch X3 Supply extension 24 V to circuit boa...

Page 29: ...heat meter electrically Connect the heat meter to the board GM C See the following graphic The M Bus circuit board shown is optionally available and only required when the heat meter is to be evaluate...

Page 30: ...e requirements of NORM H 5195 1 apply as minimum requirements for the heating water If stricter country specific regulations exist they are to be heeded Water glycol mixtures with a glycol ratio of mi...

Page 31: ...ting 18 kW 20 K spread At 18 kW power and 30 K spread a primary side flow rate of approx 0 52 m h results from the performance chart The temperature difference of the heat exchanger of 5 K is already...

Page 32: ...d for heat transfer station type 15 or type 30 The restrictor must therefore be opened about 3 8 rotations from the closed position Fig 7 1 Adjusting diagram Adapting the flow rate with the restrictor...

Page 33: ...for its design 1 The radiators account for 70 of the heat output with 60 flow and 40 return 40 C x 0 7 28 C The underfloor heating accounts for 30 of heat output when interpreted with 35 28 C 28 C x 0...

Page 34: ...am see graphic Fig 7 1 Adjusting diagram that for 0 46 m h the restrictor for heat transfer station type 15 must be opened by 3 5 rotations 7 3 Concluding activities Refitting the insulation Refit the...

Page 35: ...This applies accordingly to the secondary side 1 Close the ball valves for flow and return of the primary and secondary side in order to limit wa ter leakage 2 Carefully remove the front panel 3 Remo...

Page 36: ...at Rectifying problems 7 Bleeding the corresponding circuit is required after cleaning There is a bleed screw on the top for bleeding the primary side Fig 8 4 Bleeding the primary side 8 Reattach the...

Page 37: ...boiler and 1000 litre total water volume 1 For the module the ratio of water content to output is less than 0 3 l kW Table 2 2 The maximum output of the module is 45 kW With a total heating water vol...

Page 38: ...nd from the consumers The secondary pump starts after the set delay has expired and supplies the consumers with heat If there is no demand the secondary pump is shut down and the primary valve closes...

Page 39: ...s be carried out separately and successively on the ETAtouch control panel of the boiler itself and then on all further ETAtouch control panels 1 Plug the USB memory stick with the files for the softw...

Page 40: ...www eta co at www eta co at downloads DOWNLOAD...

Reviews: