7
SECTION 2
DESCRIPTION
The EPP-200 Power Console is designed for mechanized plasma
applications. It can be used with other ESAB products such as the
PT-24 and PT-600 torches, an optional plumbing box and a remote
set-up pendant.
t UP"NQFSFTDVUUJOHDVSSFOUSBOHF
t 'PSDFEBJSDPPMFE
t 4PMJETUBUF%$QPXFS
t *OUFHSBMXBUFSDPPMFS
t *OQVUWPMUBHFQSPUFDUJPO
t -PDBMPSSFNPUFGSPOUQBOFMDPOUSPM
t 5IFSNBMTXJUDIQSPUFDUJPOGPSNBJOUSBOTGPSNFSBOE
power semiconductor components
t -&%TUBUVTUSPVCMFTIPPUJOH
2.1 Introduction
2.2 General Speci
fi
cations
EPP-200 Power Console (0558004315):
OUTPUT (100% duty cycle)
Voltage ......................................................................................................... 160VDC
Current range DC ................................................................................. 50A to 200A
Power ................................................................................................. 8000 W to 32000 W
Open Circuit Voltage (OCV) .................................................................. 325VDC
INPUT
Voltage (3-phase) .............................................................. 200/230/380/415/460/575 Volts
Current (3-phase) ...............................................................115/100/60/55/50/40 Amperes
'SFRVFODZ
....................................................................................................50/60Hz
KVA .................................................................................................................39.8 kW
Power .............................................................................................................37.8 kW
1PXFS'BDUPS
...................................................................................................95%
*OQVU'VTF
.................................................................................. See Section 3, Installation
Summary of Contents for EPP-200
Page 1: ...EPP 200 Precision Plasmarc Cutting System 0558007005 10 2007 Instruction Manual...
Page 12: ...12 SECTION 2 DESCRIPTION...
Page 20: ...20 SECTION 3 INSTALLATION...
Page 28: ...28 SECTION 5 MAINTENANCE...
Page 34: ...34 SECTION 6 TROUBLESHOOTING...
Page 36: ...36 SECTION 7 REPLACEMENT PARTS...
Page 37: ...37 SECTION 7 REPLACEMENT PARTS...
Page 38: ...38 SECTION 7 REPLACEMENT PARTS...
Page 39: ...39 SECTION 7 REPLACEMENT PARTS...
Page 40: ...40 SECTION 7 REPLACEMENT PARTS...
Page 41: ...SECTION 7 REPLACEMENT PARTS...
Page 42: ...42 SECTION 7 REPLACEMENT PARTS...
Page 43: ...43 SECTION 7 REPLACEMENT PARTS...
Page 44: ...44 SECTION 7 REPLACEMENT PARTS...
Page 45: ...45 SECTION 7 REPLACEMENT PARTS...
Page 46: ...46 SECTION 7 REPLACEMENT PARTS...
Page 47: ...47 SECTION 7 REPLACEMENT PARTS...
Page 48: ...48 SECTION 7 REPLACEMENT PARTS...
Page 49: ...49 SECTION 7 REPLACEMENT PARTS...
Page 50: ...SECTION 7 REPLACEMENT PARTS...
Page 51: ...Revision History 3FMFBTFE BOVBSZ 3FWJTJPO 6QEBUFE OQVU POEVDUPS BOE MJOF VTF DIBSU QFS BHFF 2...