3.4.2 Primary Power Hookup Procedure
The following procedure explains the proper installation steps for
connecting primary electrical power to the plasma console.
NOTE: Safety codes specify the power ground wire be the last
connection to break should the cable be pulled out of the unit.
When preparing the cable for connection, make the ground wire
6 inches (152mm) longer than the three pr primary wires.
1. Ensure input power cable is disconnected from all electrical
sources.
2. Remove right side panel (as viewed from front of console).
3. Route input power cable through the strain relief located at the rear
panel.
4. Pull input power cable through the strain relief to allow cable wires
su
ffi
cient length to connect to main contactor. Tighten strain relief to
ensure input power cable is secured.
5. Connect input power cable ground wire to the ground lug provided
above TB2 (7 position terminal block).
6. Connect three power leads of input power cable to terminals located
atop the main contactor. Secure the leads by tightening each screw.
7. Connect jumper power cables from bottom of the main contactor
to proper input voltage marked on auto transformer. Unit is factory set
for 575V as shown at the left.
8. Connect jumper on TB2 to proper input voltage. This 7 position
terminal block jumper is factory set to 575V.
Input Power Jumper Connection
Ensure each input power jumper cable is connected to correct input
voltage on autotransformer and on TB2.
'BDUPSZXJSFEGPS7PMUT
CAUTION
Input Power Cable
Strain Relief
Main
Contactor
Ground
Connection
7 Position
Terminal
Block
Auto
Transformer
'BDUPSZXJSFE
for 575 volts
SECTION 3
INSTALLATION
Summary of Contents for EPP-200
Page 1: ...EPP 200 Precision Plasmarc Cutting System 0558007005 10 2007 Instruction Manual...
Page 12: ...12 SECTION 2 DESCRIPTION...
Page 20: ...20 SECTION 3 INSTALLATION...
Page 28: ...28 SECTION 5 MAINTENANCE...
Page 34: ...34 SECTION 6 TROUBLESHOOTING...
Page 36: ...36 SECTION 7 REPLACEMENT PARTS...
Page 37: ...37 SECTION 7 REPLACEMENT PARTS...
Page 38: ...38 SECTION 7 REPLACEMENT PARTS...
Page 39: ...39 SECTION 7 REPLACEMENT PARTS...
Page 40: ...40 SECTION 7 REPLACEMENT PARTS...
Page 41: ...SECTION 7 REPLACEMENT PARTS...
Page 42: ...42 SECTION 7 REPLACEMENT PARTS...
Page 43: ...43 SECTION 7 REPLACEMENT PARTS...
Page 44: ...44 SECTION 7 REPLACEMENT PARTS...
Page 45: ...45 SECTION 7 REPLACEMENT PARTS...
Page 46: ...46 SECTION 7 REPLACEMENT PARTS...
Page 47: ...47 SECTION 7 REPLACEMENT PARTS...
Page 48: ...48 SECTION 7 REPLACEMENT PARTS...
Page 49: ...49 SECTION 7 REPLACEMENT PARTS...
Page 50: ...SECTION 7 REPLACEMENT PARTS...
Page 51: ...Revision History 3FMFBTFE BOVBSZ 3FWJTJPO 6QEBUFE OQVU POEVDUPS BOE MJOF VTF DIBSU QFS BHFF 2...