Instalacion_77.fm -
24/5/13
VULCAN S hydraulic operator
51
INSTALLATION
Loosen the discharge screw
Mount the gland and introduce the cable
1
Introduce the cable (3) through the gland PG11 (1).
2
Position the gland in the end cap (4) and attach
using the nut PG11 (2).
3
Crimp the Faston connectors in the electrical cables
(5).
CAUTION. VERY IMPORTANT:
1
Once the operator is mounted on the supports,
turn the discharge screw (1) once to allow the
correct operation of the hydraulic system.
O
If you have to dismount the operator from
its supports, first tighten the discharge screw
in order to prevent the hydraulic fluid from
leaking.