Instalacion_77.fm -
27/5/13
VULCAN S hydraulic operator
49
INSTALLATION
Procedure
Position the front and rear supports
Mount the ball bearing joint and the gudgeon
1
Attach the front (1) and rear (2) supports, keeping strictly
to the dimensions shown in the previous section.
The installer should choose the support attachment
system (welding, screwing, molding, etc) in accordance
with the composition of the material to which the
supports are attached (metal, concrete, etc).
Attach the supports on sufficiently robust
structural elements.
2
Weld the support brackets (3) and (4) to the
supports (1) and (2).
O
Carry out the welding with the operator withdrawn and
at a distance. If not, the piston rod may become
damaged from Welding splatter, which could lead to
failures and oil leaks.
1
Introduce the nut (1) in the ball bearing joint (2).
2
Thread the ball bearing joint-nut set on the piston
rod (3).
Before doing this, apply grease to the ball
bearing joint and the piston rod.
3
Position the gudgeon (4) in its housing in the rear
end cap (5).
4
Introduce the horizontal pin (6), crossing the
gudgeon and the top.
Horizontal pin:
ø
= 10mm, L = 57.2mm
5
Secure the pin using the safety washers (7).
6
Position the caps (8) to close the housing.