![Erreka Dolfin DOS424E Installer Manual Download Page 62](http://html1.mh-extra.com/html/erreka/dolfin-dos424e/dolfin-dos424e_installer-manual_2424396062.webp)
Instalacion_153.fm -
5/9/11
INSTALLATION
58
Installation Manual
Connection of safety transmitter-receiver photocells in closing (SG.C, FT1)
Connection of safety transmitter-receiver photocells in opening (SG.A, FT2)
Connection to the grid
We recommend installing opening and closing
safety photocells.
1
Complete the connections as shown in the figure.
2
Duly programme the operator:
Closing photocells
with pre-testing
:
C511
Closing photocells
without pre-testing
:
C510
Without closing photocells:
C500
For further details on programming, see “Start up
and programming” on page 59.
We recommend installing opening and closing
safety photocells.
1
Complete the connections as shown in the figure.
2
Duly programme the operator:
Opening photocells
with pre-testing
:
C411
Opening photocells
without pre-testing
:
C410
Without opening photocells:
C400
For further details on programming, see “Start up
and programming” on page 59.
1
Connect the line cable (L) to the connection strip
lower cable connector and the neutral cable (N) to
the upper cable connector.
2
Connect the earth cable (T) to the operator frame.
3
Ensure the main fuse (F) is correctly in place.
DOS424E (230Vac/50Hz): FUS 5x20, 2.5A
DOS424EM (125Vac/60Hz): FUS 5x20, 4A
Never forget to connect the earth cable, in
order to prevent the risk of electrical discharge.
FT1
FT2
P153H
T
Summary of Contents for Dolfin DOS424E
Page 2: ......
Page 26: ...Actualizado 23 5 11 MANTENIMIENTO Y DIAGN STICO DE AVER AS 22 Manual de instalaci n...
Page 48: ...Mis jour 7 9 11 MAINTENANCE ET DIAGNOSTIC DE PANNES 44 Manuel d installation...
Page 70: ...Updated 5 9 11 MAINTENANCE AND DIAGNOSIS OF FAILURES 66 Installation Manual...
Page 92: ...Actualizado 7 9 11 MANUTEN O E DIAGN STICO DE AVARIAS 88 Manual de instala o...