DOLFIN operator for sliding gates
57
INSTALLATION
4
ELECTRICAL CONNECTIONS
Complete the installation in line with low voltage regulations and applicable rules.
Use cables with sufficient section, always earthed.
Check the manufacturer's instructions for all the elements installed.
General connections
ST1
ST2
COM
FT1
FT2
B
ATTER
Y
IN/OUT
ADO01
BAT
(2x12V/1,2 Ah)
CHG
ADO01
Charger kit (CHG) + batteries (2x 12V /
1.2Ah)
BAT
Batteries
SMF
Traffic light card AEPS1-001
SCA
SCA light (24Vdc)
A.T
(FT1) Total opening key device
A.P
(ST2) Pedestrian opening key device
SG.C
(FT1) Closing safety device (mechanical strip or
photocell)
SG.A
(FT2) Opening safety device (mechanical strip
or photocell)
FT
Output 24Vdc for photocells (cable
connectors 6 and 7)
AUX
Output 24Vdc (cable connectors 7 and 8)
DEST
Flashing light (max. 60W)
DOS424E: 230VAC, 50Hz
DOS424EM: 125Vac, 60Hz
LG
Garage light (max. 2,300W resistive)
DOS424E: 230VAC, 50Hz
DOS424EM: 125Vac, 60Hz
ANT
Antenna connection
R.E
Plug-in receiver
O
When installing batteries, ensure they are connected through an external
charger (CHG). Do not connect them directly to the control board.
The ADO01 kit is recommended, consisting of a charger and two 12V /
1.2Ah batteries, as it has been designed for use in this operator.
Summary of Contents for Dolfin DOS424E
Page 2: ......
Page 26: ...Actualizado 23 5 11 MANTENIMIENTO Y DIAGN STICO DE AVER AS 22 Manual de instalaci n...
Page 48: ...Mis jour 7 9 11 MAINTENANCE ET DIAGNOSTIC DE PANNES 44 Manuel d installation...
Page 70: ...Updated 5 9 11 MAINTENANCE AND DIAGNOSIS OF FAILURES 66 Installation Manual...
Page 92: ...Actualizado 7 9 11 MANUTEN O E DIAGN STICO DE AVARIAS 88 Manual de instala o...