Operating Instruction
Spindle lifting system SLA/SLG VD
Document no.: B-00081
Edition 2019 02
Operating instruction EN
Copyright by Ergoswiss AG
9/20
-
Motor socket 1 - 4
(S) Socket for manual control switch
(D) Connection for safety strip or sync cable
(P) Power socket
ATTENTION
Connecting homemade products to the control box is prohibited!
1.
Connect the motor cable to the control box.
(Please follow the order M1-M4!)
2.
Connect the manual control switch to the control box.
3.
Connect the power cable to the control box.
4.
Connect the power cable to the mains. (Clicking sound
→
ready for initial operation)
NOTE
Before connecting the power cable to the mains the following must be verified:
→
Does the mains voltage correspond to the value on the name plate of the control box?
→
Are the plugs of the motor cable connected to the correct sockets (M1-M2)?
→
Is the entire lifting system assembled according to the assembly instructions?
1
2
3
4
S
P
D