EPSON Stylus Color 400 Service Manual
Rev. A
3-18
3.2.4.6 Removing the ASF Assembly
1. Remove the housing. (Refer to 3.2.1)
2. Release the fixed hook from the inside of printer mechanism and remove the gear 34 from the roller
axis of the ASF assembly.
3. Take out cables from the cable hook on the printer mechanism and from the hook of the ASF
assembly.
4. After removing 2 screws(one No.7 and one CR axis installation screw), remove the ASF assembly,
detaching peaking on the left side of ASF assembly from the frame holes.
When installing the ASF assembly, make sure that the frame and ASF assembly are attached
each other without any space.
Screws for ASF assembly should be used at the following positions. (Looking from the back of
printer)
Right :CR axis installation screw
Left : Screw No.7 (
•{
Bind, S- tight, Sems R2; with plane washers)
WORK POINT
Screw with Washer (No.7)
Gear 34
CR Axis Installation Screw
Make sure that protrusions
in the ASF Assembly are in
these holes on the frame
when installing the ASF
assembly.
Figure 3-15.Removing the ASF Assembly
Summary of Contents for Stylus Color 400
Page 5: ...REVISION SHEET Revision Issued Data Contents Rev A February18 1997 First issue ...
Page 126: ...Chapter 6 Maintenance Rev A 6 5 No 1 No 2 10mm 2mm 2mm No 3 No 11 GEAR 34 ...
Page 138: ...EPSON Stylus Color400 Service Manual Rev A A 9 Figure A 3 C206 PSB Board Component Layout ...
Page 139: ...Appendix Rev A A 10 Figure A 4 C206 PSE Board Component Layout ...
Page 140: ...EPSON Stylus Color400 Service Manual Rev A A 11 Figure A 5 C206 PNL Component Layout ...
Page 141: ...Appendix Rev A A 12 A 5 Exploded Diagrams Figure A 6 Stylus Color 400 Exploded Diagram 1 ...
Page 143: ...Appendix Rev A A 14 Figure A 8 Stylus Color 400 Exploded Diagram 3 ...
Page 145: ...EPSON SEIKO EPSON CORPORATION ...