![Epson Stylus Color 400 Service Manual Download Page 81](http://html.mh-extra.com/html/epson/stylus-color-400/stylus-color-400_service-manual_109597081.webp)
EPSON Stylus Color 400 Service Manual
Rev. A
3-14
3.2.4.4 Removing the CR Motor Assembly
1. Remove the housing. (Refer to 3.2.1)
2. Rotate the gear 67.2 toward you and release the carriage lock mechanism. Move the carriage
to the center.
3. Loose the timing belt by pushing the driven pulley holder and remove the timing belt from the pulley
of the CR motor side.
4. Remove two screws(No.1) and take out the CR motor assembly.
After installing the CR motor assembly, make sure that two peaking of motor bracket are in the holes
for determing position on the frame. (Refer to the figure on the next page)
WORK POINT
Driven Pulley Assembly
Timing Belt
Driven Pulley Holder
Compression Spring 19.6
To the Interior of Side Frame
To the Exterior of Side Frame
Figure 3-11. Removing the Timing Belt
Summary of Contents for Stylus Color 400
Page 5: ...REVISION SHEET Revision Issued Data Contents Rev A February18 1997 First issue ...
Page 126: ...Chapter 6 Maintenance Rev A 6 5 No 1 No 2 10mm 2mm 2mm No 3 No 11 GEAR 34 ...
Page 138: ...EPSON Stylus Color400 Service Manual Rev A A 9 Figure A 3 C206 PSB Board Component Layout ...
Page 139: ...Appendix Rev A A 10 Figure A 4 C206 PSE Board Component Layout ...
Page 140: ...EPSON Stylus Color400 Service Manual Rev A A 11 Figure A 5 C206 PNL Component Layout ...
Page 141: ...Appendix Rev A A 12 A 5 Exploded Diagrams Figure A 6 Stylus Color 400 Exploded Diagram 1 ...
Page 143: ...Appendix Rev A A 14 Figure A 8 Stylus Color 400 Exploded Diagram 3 ...
Page 145: ...EPSON SEIKO EPSON CORPORATION ...