4.
5.
6.
Position one of the cache chips over the first socket as shown
below, aligning the pins on the chip with the holes in the
socket. Make sure the small notch on the end of the chip is
aligned with the corresponding notch on the socket.
Gently press the chip halfway into the socket (to make sure
it is correctly aligned). If the chip goes in at an angle,
remove it with a chip puller or a small flat-head
screwdriver and try again.
When the chip is properly positioned, push down firmly on
both ends of the chip to make sure it is well-seated.
Repeat steps 4 through 6 for each of the remaining chips.
Change jumpers J7, JlO, Jll, J13, and J14, as described on
page 3-8, to correspond to the amount of cache you
installed.
Replace any option cards you removed. See page 3-14 for
instructions.
Installing and Removing Options
3-23
Summary of Contents for EL 486UC
Page 1: ...EPSON EL 486UC User s Guide This manual is printed on recycled paper and is 100 recyclable ...
Page 30: ...Hard disk drive types continued 1 14 Setting Up Your System ...
Page 68: ...Possible microprocessor upgrades Installing and Removing Options 3 25 ...
Page 121: ...Specifications A 7 ...
Page 122: ...A 8 Specifications ...
Page 132: ...400235000 ...