background image

AN2 Series

Installation Instructions

16

FASTENER INSTALLATION METHODS

NOTE:

Refer to Table 1 for appropriate hardware and pilot hole

sizes for various wall types.

Steel Stud / Drywall

1.

Hold metal channel on anchor (H) flat alongside plastic
straps and slide channel through hole. (See Figure 27)

Figure 27

2.

Holding plastic straps on anchor (H), pull anchor away from
wall until channel rests flush behind wall making sure anchor
channel is positioned vertically on drywall, or steel stud (if
present). (See Figure 28)

3.

Slide plastic cap on anchor (H) towards wall until flange of
cap is flush with wall. (See Figure 28)

Figure 28

4.

Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 29)

Figure 29

5.

Line up anchor with attachment point.

6.

Insert 1/4-20 x 1-3/4" Phillips pan head screw (F) through
1/4" washer (G), corresponding mounting hole in product
and into anchor (H), and tighten until flush against product.
DO NOT over tighten! (See Figure 30)

Figure 30

(H)

Drywall

Plastic straps

1

(H)

Plastic cap

Drywall

Anchor metal channel

3

Steel stud

(side view)

2

(if present)

Plastic straps

Drywall

Anchor metal channel

Plastic cap

4

Steel stud

(side view)

(if present)

Drywall

Anchor metal channel

(F) x 4

6

Steel stud

(G) x 4

(side view)

(if present)

Product

Summary of Contents for AN2WA87

Page 1: ...I N S T A L L A T I O N I N S T R U C T I O N S Epson All in One Collaborative Whiteboard AN2 87 and 100 AN2 Series ...

Page 2: ...installed using the instructions provided WARNING Failure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment It is the installer s responsibility to make sure the structure to which this component is attached can support five times the combined weight of all equipment Reinforce the structure as required before installing the comp...

Page 3: ...Installation Instructions AN2 Series 3 DIMENSIONS DIMENSIONS INCHES MILLIMETERS AN2 87 DIMENSIONS INCHES MILLIMETERS AN2 100 ...

Page 4: ... Chave de bocas Chiave a punte aperte Steeksleutel Clé à fourche By Hand A mano Von Hand Com a mão A mano Met de hand À la main Hex Head Wrench Llave de cabeza hexagonal Sechskantschlüssel Chave de cabeça sextavada Chiave esagonale Zeskantsleutel Clé à tête hexagonale Pencil Mark Marcar con lápiz Stiftmarkierung Marcar com lápis Segno a matita Potloodmerkteken Marquage au crayon Drill Hole Perfora...

Page 5: ... 2 4 24 x 1 4 HH 1 Marker kit EE 1 FF 1 Marker tray C 1 Left valence bracket D 1 Right valence E 1 Valence NN 1 IR Cable Control panel assembly BB 4 Toggler AF6 MM 5 Whiteboard bracket Upper wall bracket B 1 Wall hanging bracket bracket 9200 003827 9200 003805 9200 003817 F 4 1 4 20 x 1 3 4 G 4 1 4 M 4 10 24 x 3 8 N 1 Boom spacer P 1 5 16 Q 1 5 16 U 1 Sensor cover V 4 M4 x 12mm X 4 10 24 x 1 3 4 Y...

Page 6: ...ill one pilot hole see Table 1 for size at location marked in Step 3 See Figure 1 and follow fastener information appropriate for wall type located in Table 1 IMPORTANT See Fastener Installation Methods at end of Installation Instructions for details on installing product into various wall types Table 1 Fastener Information WALL TYPE PILOT HOLE FASTENERS see PARTS drawing Drywall only boom attach ...

Page 7: ...t over studs See Figure 4 NOTE For wood or steel stud walls mark at least two locations for attachment a minimum of 16 apart and a maximum of 24 apart AND within slots on wall bracket assembly NOTE For concrete walls mark at least two locations for attachment a minimum of 16 apart AND within slots on wall bracket assembly 7 Drill one pilot hole see Table 1 for size at each location marked in Step ...

Page 8: ...ips machine screws X and refasten projector mount to boom arm See Figure 5 5 AN2 100 Only Turn adjustment bolt to move projector mount towards end of boom arm until front of adjustable plate lines up with 100 marking on boom arm See Figure 5 6 Hang boom projector mount S over bolt on wall bracket assembly and loosely fasten hand tighten using boom spacer N 5 16 washer P and 5 16 nut Q See Figure 6...

Page 9: ...bly is attached 3 3 S Wall bracket assembly 2 PP x 4 5 4 Center whiteboard assembly on wall bracket NOTE Notch in wall bracket assembly indicates center of whiteboard 5 Level the whiteboard against the wall by placing a level against the front of it and adjusting the leveling feet See Figure 7 6 Continue to adjust until whiteboard is leveled with the wall 7 Remove and keep one fastener from bottom...

Page 10: ...igure 11 4 Add and route cables following instructions included with the projector NOTE Do NOT place extra cable length behind the sensor bracket Figure 11 5 Place a level on top of the boom arm mount and level the mount after the projector is installed See Figure 12 5A Tighten nut to increase boom arm angle 5B Loosen nut to decrease boom arm angle 6 Place a level on top of interface T and level S...

Page 11: ...hat the left and right vertical lines of the test pattern are parallel with each other and each side of whiteboard 1 Loosen ROLL adjustment locking screw using a 2 Phillips screwdriver See Figure 13 2 Turn ROLL micro adjustment screw right or left using a 2 Phillips screwdriver until image is properly aligned on target 3 Tighten ROLL adjustment locking screw using a 2 Phillips screwdriver Figure 1...

Page 12: ...crewdriver Figure 15 Micro Adjustment IMPORTANT The projected image should NEVER project onto the whiteboard frame An image overlapping onto the whiteboard frame may prevent the projector touch sensor from working properly 1 If required turn the micro adjust fastener clockwise to extend projector further from wall See Figure 16 2 If required turn the micro adjust fastener counterclockwise to retra...

Page 13: ...lling Control Housing 1 Open door on control panel assembly EE 2 Insert edges of control panel assembly EE into groove in whiteboard frame with tab placed behind whiteboard See Figure 19 3 Slide control panel assembly up along side of whiteboard to the desired height See Figure 19 4 Determine attachment location on wall See Figure 19 5 Mark attachment hole through slot in control panel assembly EE...

Page 14: ...aching Valence 1 Align right valence bracket D along outside of right brace on back of valence E and fasten with two 10 24 x 1 4 Phillips pan head machine screws L See Figure 21 2 Align left valence bracket C along outside of left brace on back of valence E and fasten with two 10 24 x 1 4 Phillips pan head machine screws L See Figure 21 3 Slide the valence E with attached brackets into the boom pr...

Page 15: ...or Cover and Outer Cover 1 Reattach the sensor cover using the fastener previously removed See Figure 2 Figure 24 2 Hold sensor outer cover U under boom projector mount and begin sliding downward toward top of whiteboard See Figure 25 3 Continue sliding cover downward until tabs at bottom of cover slip into slot on top of whiteboard See Figure 25 Figure 25 Attaching Marker Tray 1 Attach marker tra...

Page 16: ... wall until flange of cap is flush with wall See Figure 28 Figure 28 4 Snap off plastic straps on anchor at wall by pushing side to side snapping off straps level with flange of plastic cap See Figure 29 Figure 29 5 Line up anchor with attachment point 6 Insert 1 4 20 x 1 3 4 Phillips pan head screw F through 1 4 washer G corresponding mounting hole in product and into anchor H and tighten until f...

Page 17: ...t and into pilot hole See Figure 31 2 Repeat for remaining pilot hole Figure 31 Concrete NOTE Refer to Table 1 for appropriate hardware and pilot hole sizes for various wall types 1 Install an anchor K into each pilot hole using a hammer making sure that the anchor is flush with the wall 2 Use one 1 4 x 2 1 2 lag bolt J through product into each anchor in wall Figure 32 1 2 J x 2 1 2 J K ...

Page 18: ...AN2 Series Installation Instructions 18 ...

Page 19: ...Installation Instructions AN2 Series 19 ...

Page 20: ... North Detroit Street Warsaw IN 46582 P 574 267 8101 or 800 622 3737 F 574 267 7804 or 877 325 4832 E info da lite com www milestone com 2015 Milestone AV Technologies LLC AN2 Series Installation Instructions 8800 002671 Rev02 06 15 ...

Reviews: