AN2 Series
Installation Instructions
16
FASTENER INSTALLATION METHODS
NOTE:
Refer to Table 1 for appropriate hardware and pilot hole
sizes for various wall types.
Steel Stud / Drywall
1.
Hold metal channel on anchor (H) flat alongside plastic
straps and slide channel through hole. (See Figure 27)
Figure 27
2.
Holding plastic straps on anchor (H), pull anchor away from
wall until channel rests flush behind wall making sure anchor
channel is positioned vertically on drywall, or steel stud (if
present). (See Figure 28)
3.
Slide plastic cap on anchor (H) towards wall until flange of
cap is flush with wall. (See Figure 28)
Figure 28
4.
Snap off plastic straps on anchor at wall by pushing side to
side, snapping off straps level with flange of plastic cap.
(See Figure 29)
Figure 29
5.
Line up anchor with attachment point.
6.
Insert 1/4-20 x 1-3/4" Phillips pan head screw (F) through
1/4" washer (G), corresponding mounting hole in product
and into anchor (H), and tighten until flush against product.
DO NOT over tighten! (See Figure 30)
Figure 30
(H)
Drywall
Plastic straps
1
(H)
Plastic cap
Drywall
Anchor metal channel
3
Steel stud
(side view)
2
(if present)
Plastic straps
Drywall
Anchor metal channel
Plastic cap
4
Steel stud
(side view)
(if present)
Drywall
Anchor metal channel
(F) x 4
6
Steel stud
(G) x 4
(side view)
(if present)
Product