
7
7
Delivery and Handling
The Multiboost system is supplied from the factory, as an all-in-one packaged water boosting
system. The weight and size of the Multiboost (depending on model chosen) may require
the aid of lifting equipment and if so, must be handled in a safe and proper manner to
avoid causing unnecessary damage to the unit and/or individual/s. In the event that lifting
equipment is used, please follow widely accepted safe lifting procedures.
Inspection
On delivery, the Multiboost should be inspected thoroughly and any damage must be
reported to the supplier in writing within 24/48 hours. Always ensure the Multiboost
inspection takes place prior to installation.
Applications
The Multiboost set is designed to be compact, with ease of installation, and to provide many
years of service for domestic pressure boosting and light commercial pressure boosting.
The Multiboost set should not be installed in areas that are classified as hazardous, where
an explosion could occur or people could be harmed or in an area of any potential leaks that
could cause damage to any person or property. The use of bunded tanks and/or a drip tray are
essential to any Multiboost being installed above ceiling level.
EPS accepts zero responsibility if the Multiboost is used to pump liquids that are considered
hazardous by touch, ingestion or inhalation of fumes or gases given off by the liquid, or any
damage caused to property where the recommended protection of a drip tray or use of
bunded tank was not adhered to.
Warranty
Your Multiboost system is covered by a 12 month warranty from the date of purchase. This
warranty covers all parts or material defects and will be replaced free of charge. Labour call
outs for warranty / repair will require a call out fee of €150 incl. VAT. This fee must be paid
up front to secure call out. If there is a warranty defect with the unit, it will be repaired /
replaced and your €150 will be refunded. If there is a defect outside EPS’ control (i.e. incorrect
installation) the €150 fee will not be refunded. The additional cost of replacement parts will be
administered in this situation also. EPS cannot carry out any tests, servicing or repairs on a unit
if the drip tray has not been fitted as part of the unit being installed in the property.
Site Storage
Once a Multiboost has arrived on site and has been inspected, it is recommended that it is
stored away from sharp objects, in a safe place, on an even surface, free from moisture, dust,
sunlight and frost.
Pre Installation Checks
Please ensure the unit is fitted and supported in the right manner. Check the unit for any visual
defects.
In accordance with the latest IEE regulation, all electrical connections should be carried out
by a qualified electrician. The Multiboost must be earthed. EPS strongly recommend that
a correctly sized RCBO for fixed speed and MCB for variable speed units are fitted on the
incoming electrical supply. If the installer is fitting a plug, please ensure the correct fuse is
selected in relation to the pump selection ampage. Please see page 13 for more information.
Delivering, Handling and Storing
Multiboost Range
• Please ensure that Presflo Multi system is fitted with the correct rated RCBO on incoming electrical supply
• Please ensure that the Steadypres is fitted with the correct rated MCB on incoming electrical supply