Commissioning Checklist
Commissioning Checklist
INSTALLATION AND COMMISSIONING CHECKLIST
ITEM
STATUS
COMMENT
Visual inspection of Multiboost for any defects
Yes No
Is a Multiboost installation label on tank?
Yes No
Is there a drip tray installation label on tank?
Yes No
Is the Multiboost positioned in a safe location?
Yes No
Is the Multiboost installed away from direct sunlight?
Yes No
Is there a bypass unit fi tted around system?
Yes No
Is there a shut off valve fi tted on inlet of tank?
Yes No
Is a drip tray fi tted with correct size overfl ow?
Yes No
Is an insulation jacket fi tted?
Yes No
Has the correct overfl ow pipe beenW selected for Multiboost?
Yes No
Has the correct overfl ow pipework been selected for drip tray?
Yes No
Have overfl ows been piped separately, without any sharp
edges which could cause restriction?
Yes No
Has incoming water pressure been tested and has the correct
ballcock been selected and tested?
Yes No
Has the Multiboost been fi tted in a ventilated area?
Yes No
Has the unit’s power supply to electrical supply been
connected in accordance with current regulations and by a
qualifi ed, trained person?
Yes No
Has a full test of overfl ow pipes been done?
Yes No
Has the system been correctly installed and fully tested?
Yes No
Any pressure reducing valves fi tted on line ?
If yes, has the control unit been adjusted to the correct
parameters for operation?
Yes No
Incoming water pressure to Multiboost
PSI
Multiboost cut in pressure
PSI
Multiboost close valve pressure
PSI
QR CODES
Installation
Video
O&M
Manual
Unit
Schematics
Print Name
(Installer):
Signed:
Position:
Date:
Print Name
(Engineer):
Signed:
Position:
Date:
Yes
No
EPS recommends the use of a drip tray for each installation