EN-42
Installation and Operating Instructions - EOS Zeus HD / Zeus L HD
Maintenance
EN
9
Tighten the nuts (
D
) on the terminal box with a torque wrench (159 Nm).
Ensure that no water can seep into the terminal box.
10
Tighten the nuts (
B
) on the copper strip using a ring or socket spanner
(SW7).
The nuts (
B
) must not be tightened too much, otherwise there is a risk
that the ceramic insulation on the tubular heating element will break.
11
Place the cover and side panel on the terminal box and tighten the
screws.
12
Insert the heating coil.
See
Inserting the heating coil
1
Insert the heating coil from above and rotate until all screw holes are vis-
ible.
2
Screw in the 4 crosshead screws and tighten them.
3
Position the decoration ring and safety slots or stone attachment.
4
Arrange the stones in place so there is ample space between them.
See
5
Reconnect the power supply.