![EOS Revelation II USF-T9 User Manual Download Page 22](http://html.mh-extra.com/html/eos/revelation-ii-usf-t9/revelation-ii-usf-t9_user-manual_2417017022.webp)
REVELATION
Ⅱ
REVELATION
Ⅱ
Alkaline Water Ionizer
Alkaline Water Ionizer
REVELATION
Ⅱ
Faucet Installation Continued
3. The REVELATION
Ⅱ
communication cable, input tube and output tube will
dangle through the hole.
4. Next attach the
¼
inch and 3/8 inch unions to these tubes. Once the unions are
installed, screw the REVELATION
Ⅱ
clamp to the faucet and tighten. The
REVELATION
Ⅱ
faucet is now installed.
Installing the REVELATION
Ⅱ
Base:
1. Place the REVELATION
Ⅱ
body on the floor of your cabinet with the back facing
you.
2. Remove the plugs from the REVELATION
Ⅱ
water inlets and outlets. Use your
thumb and index finger to pinch between the cap of the plug and the ring on the
adapter, simultaneously pushing the ring in toward the body while gently pulling out
the plug.
3. Next, install the cold water line diverter valve to the cold water line. The cold
water spigot is on the right (hot water is on the left). You first need to turn off the
water supply by turning the spigot handle all the way to the right. Once the water is
turned off, now you need to unscrew the
½
inch hose that is attached to the spigot.
You may need pliers if you can't unscrew it by hand.
Note: If you have copper pipes, the provided cold water line diverter valve will not fit.
You will need to purchase a copper pipe diverter valve from your hardware store.
Note: Some hoses attached to the cold water line spigot are 3/8 inch and not
½
inch.
If this is the case, please contact your authorized dealer and ask them to ship you a 3/8
inch cold water line diverter valve.
Once you have unscrewed the hose attached to your cold water line spigot, install the
cold water line diverter valve inbetween the hose and the spigot, noting that the
female end of the diverter valve attaches to the spigot while the cold water line hose
attaches to the male end of the diverter valve. Finally, adjust the water flow control
lever on your cold water line diverter valve to about the midway position.
22
Installation Instructions
REVELATION
Ⅱ
Base Installation Continued
Now that the cold water line diverter valve is installed, you can connect the
¼
inch
REVELATION
Ⅱ
tubing. Unscrew the
¼
inch tubing cap from the cold water line
diverter valve. Push the
¼
inch tubing onto the exposed knob, then screw the tubing
cap back onto the cold water line diverter valve in order to securely attach the
¼
inch
tubing to the cold water line diverter valve.
Now run the
¼
inch tube to the REVELATION
Ⅱ
base and cut the tube to the length
that you need to go between the cold water line diverter valve and the base, allowing
enough slack for the base to be able turn all the way around (for when you need to
replace filters).
4. Attach the dust filter to the
¼
inch tube. Simply attach the IN of the dust filter to
the end of the cut
¼
inch tube, then cut a small length (about three inches) of
¼
inch
tubing to attach to the OUT of the dust filter, as indicated by the water flow
directional arrow on the dust filter.
5. Press the tubing attached to the OUT of the dust filter into the WATER INLET on
the back of the REVELATION
Ⅱ
base.
6. Attach the 3/8 inch REVELATION
Ⅱ
tube into the ALKALINE WATER INLET on
the base. Run this tube to the 3/8 inch union attached to the REVELATION
Ⅱ
faucet,
then cut to the desired length. Be sure to leave enough slack to be able to maneuver
the REVELATION
Ⅱ
base during filter changes.
7. Next, attach the remaining
¼
inch REVELATION
Ⅱ
tube into the ACIDIC WATER
INLET. Run this tube to the
¼
inch union attached to the REVELATION
Ⅱ
faucet,
then cut to the desired length. Be sure to leave enough slack to be able to maneuver
the REVELATION
Ⅱ
base during filter changes.
8. Next, attach the REVELATION
Ⅱ
base communication cable to the
REVELATION
Ⅱ
faucet communication cable.
9. Plug in the REVELATION
Ⅱ
base to a power outlet.
23
Installation Instructions