![Enwork Grid Frame Installation Instructions Manual Download Page 9](http://html1.mh-extra.com/html/enwork/grid-frame/grid-frame_installation-instructions-manual_2416528009.webp)
Note:
When passing cables through leg with cut-out at the bottom, we recommend running a
maximum of 12 data cables along with a Power infeed cable.
Tiles
23. Once power and data are done you can slide the appropriate tiles into provided slots of the Grid
Frames.
24. Re-attach Spine Wall top caps (not the 90 degree Fin Walls) first making sure that the tiles set in
top cap grooves. Using #15 Torque drive install 4 - #8-32 screws (UZSCREWALZ without thread
cutting).
25. Applications with 90 degree Fin Walls need to attach the Fin Walls to the top cap of the Spine
Wall. Using a #10-24 x 1/2“ Screw (UZSCREWZ) and #10-24 weld nut (UZWNUTA) attach Fin wall
to Spine Wall top cap as shown below. The weld nut is placed in the slot on the side of the Spine
wall top cap. Square up wall before tightening screw.