C. End Panels – don’t attach to Grid Frames but rather attach to worksurfaces with L” Brackets.  In

this application a Grid Frame straight or T-leg is NOT NEEDED in the end of Grid Frame runs.  The
Grid Frame is held up by a tether bracket that attaches the worksurface to the Frame (tether
brackets are described later in this manual).

D. O-Legs - don’t attach to Grid Frames but rather attach to worksurfaces.  In this application a Grid

Frame straight or T-leg is NOT NEEDED in the end of Grid Frame runs.  The Grid Frame is held up
by a tether bracket that attaches the worksurface to the Frame (tether brackets are described
later in this manual).

Note:  Prior to setting up Grid Frames, note where power and data will be fed up through leg(s), 
whether at the end or in the middle of a run.  Make sure to install legs with power infeed holes 
into Grid Frames at appropriate locations. 

Assembly 

1)

Identify from the labeled cartons the End of Run Frames and unpack these frames first.  Turn

the Frames 

upside down 

to attach the legs.  Take care that legs are inset 6” from Finished End

(end with no holes) as shown below, using a Phillips Head drive to assemble the 2” screws (P/N
UZBOLTU) and 10-24 weld nuts (UZWNUTA).   The Legs are mounted 6” inboard at the end of a
run and when starting a 90 or 120 run of Frames.  See pictures below of assembly process and
final product.

Summary of Contents for Grid Frame

Page 1: ...Grid Installation Instructions Rev 0812 ...

Page 2: ...er data openings in both ends c Freestanding Frame no openings single frame only Supports that attach to Grid Frames will be one of four styles Packed separately A Straight Legs either with or without power infeed hole Note Grid legs are available in 2 heights the shorter height puts power data below the wksf while the taller height places power data above the top B T Legs either with or without p...

Page 3: ...ce to the Frame tether brackets are described later in this manual Note Prior to setting up Grid Frames note where power and data will be fed up through leg s whether at the end or in the middle of a run Make sure to install legs with power infeed holes into Grid Frames at appropriate locations Assembly 1 Identify from the labeled cartons the End of Run Frames and unpack these frames first Turn th...

Page 4: ...1 End of Run frame should have the shared leg mounted prior flipping the frame over for final leg assembly 3 When Spine walls of 3 Grid Frames are used the Mid Frames will not have any legs attached to them They will use the Shared leg from the End of Run Frames 4 Spine wall runs of 4 Grid Frames or more will have 1 shared leg attached to each Mid Frame This will be for the 4th 5th etc Mid Frames ...

Page 5: ... out the 4 8 32x3 4 Flat head screws UZSCREWAL on the top of each Grid Frame using a 15 Torque head drive Leave Top Caps off until step 24 7 Attach in line panel to panel connections using 10 24 screw UZSCREWW and 10 24 lock nut UZWNUTB through aligned holes at the top of the End Caps 8 If the Spine wall does not have any 90 Degree or 120 Degree Grid Fin walls go to Line 16 9 If you are beginning ...

Page 6: ...e along slots Slide bracket so that you can attach screws into weld nuts in perpendicular Grid Frame Once both screws have engaged and both frames are at right angles to each other tighten all 4 screws Grid Frames should now be able to stand by themselves with little or no support 13 Repeat lines 11 12 until all Fin Walls are attached to Spine Wall The tops of the Fin Walls will be attached in ste...

Page 7: ...Use 3 10 24 x 3 8 UZSCREWU thread forming screws included in kit 16 Level as necessary Power 17 Feed Base Power In through the frame and down the leg coming out the hole in the bottom of the leg Attach the upper connector to the frame s power power in frames is pre installed at the factory Adjust the length of Power In as required cut add attachments as needed to finish electrical assembly ...

Page 8: ... panel If you are lucky enough to have a 90 degree connection in front of a power data opening on the spine you may utilize the hole in the Beltway to route the power 20 If you are transferring power in a 120 degree connection than a special jumper and a splitter UYCONN is used to go out the end of the frame and into the next Frame Data 21 Pick the appropriate dataplate provided and add cabling an...

Page 9: ... not the 90 degree Fin Walls first making sure that the tiles set in top cap grooves Using 15 Torque drive install 4 8 32 screws UZSCREWALZ without thread cutting 25 Applications with 90 degree Fin Walls need to attach the Fin Walls to the top cap of the Spine Wall Using a 10 24 x 1 2 Screw UZSCREWZ and 10 24 weld nut UZWNUTA attach Fin wall to Spine Wall top cap as shown below The weld nut is pla...

Page 10: ...loor plan in preparation for attachment to Grid Frame 2 If worksurfaces are ped supported then place peds into position per floor plan 3 If attaching work surfaces to Grid Tether Brackets UMTB or UMTD will need to be attached to Spine wall as shown below UMTB Tether Bracket are used for tall legs power data above worksurface see above UMTD Tether Brackets are used for short legs power data below w...

Page 11: ...r a Tight to frame these worksurfaces have a C in them e g S2448ACN b gap to frame these worksurfaces have a D in them e g S2448ADN c 1 1 gap to frame these worksurfaces have a V in them e g S2448AVN 6 Add support plates where applicable 7 End Panel and O Leg supports are described earlier in this manual Topper Screen 1 Insert acrylic Topper Screen and steel Topper Spacer into top slot of Frame Be...

Page 12: ...h every Frame you will receive a UZBAND trim tape This tape is put on ONE side of the frame to cover up the holes visual improvement It is not a structural product Peel the back side of the tape off and apply from one end to the other working the tape into the slot It is best to do this after the topper screens are installed ...

Page 13: ...les in top lip of modesty panel Attach nuts 4 40 UZWNUTC to small bolts as shown below 2 Slide modesty panel into bottom slot The head of bolt holds modesty in slot NOTE the bolts nuts will want to spin and have the nuts fall off Be careful to periodically stop and check to make sure nuts are still adequately attached to bolts ...

Page 14: ...her bracket rules are followed the cable troughs will be able to be placed into second slot up on bottom rail 2 Utilize a 3 8 screw UZSCREWW and weld nut UZWNUTA to mechanically attach the cable trough to the bottom slot at circle location in picture 3 Brick troughs when supplied can be attached where needed though cannot used in conjunction with cable troughs ...