![Enwork Grid Frame Installation Instructions Manual Download Page 12](http://html1.mh-extra.com/html/enwork/grid-frame/grid-frame_installation-instructions-manual_2416528012.webp)
2. Tighten thread cutting screws (UZSCREWU) into inner holes, pushing spacer against acrylic
topper screen.
Trim Piece (UZBAND)
With every Frame you will receive a UZBAND trim tape. This tape is put on ONE side of the
frame to cover up the holes (visual improvement). It is not a structural product. Peel the back
side of the tape off and apply from one end to the other working the tape into the slot. It is best
to do this after the topper screens are installed!