12
NSKW INSTALLATION MANUAL
Alternate Hot Water Installation with
Direct Coupling to a Double Wall Unit
P/T
Ports
P/T
Ports
Ball Valve
Dielectric
Unions
Dielectric
Unions
WaterFurnace
NSKW06 (Heating Only)
with Double Wall Load Coax
WaterFurnace
GEOTANK
Ball Valve
HOT
COLD
LOOP FIELD
FLOW CENTER
NOTES:
1) Unions and valves must be installed so that acid flushing
of the heat exchanger is possible.
2) Make sure there is not a check valve in the diptube of the
tank.
3) Route thermistor wires to NSKW. Remove yellow
thermistor wires on TB 3 and 4 from control box and
connect thermistor wires from geothermal storage tank.
Set the pump sampling (PS) in the set up of the control
board to continuously (C) sampling (reference Note 5 in
the Wiring Schematic).
Potable Water Systems cont.