
Secondary Installation
P
aneL
i
nstaLLation
(o
PtionaL
):
These instruction are applicable to both the Q2 brick liner set (50-2977) and the Q2 enamel porcelain
liner set (50-2978).
DATE: 8/7/2014
BY
SHERWOOD INDUSTRIES LTD.
INTERNAL ASSEMBLY MANUAL
THIS DRAWING IS THE PROPERTY OF SHERWOOD INDUSTRIES LTD. AND MAY NOT BE COPIED, REPRODUCED, OR OTHERWISE DISCLOSED WITHOUT THE PRIOR APPROVAL OF SHERWOOD INDUSTRIES LTD.
1 of 1
SHEET:
STOVE:
UPDATED: ----/--/--
BY --
REVISION:
0.0
Step 1
:
Be sure the fireplace is cool.
Remove the door, the log set (if installed),
log grate, burner tube, and the upper
and lower air diverters. Removal of these
parts will be found in the
M
aIntenance
anD
s
erVIce
section of this manual. Once
all required components are removed your
appliance should resemble Figure 34.
Step 2
:
The panels are
delicate so please handle
with care.
Remove the panels
from their packaging and insert
the rear liner first followed by
the sides. Hold into position as
shown in Figure 35.
Step 3
:
Screw the (2) retainer brackets into
the existing exhaust baffle with the supplied
#8 T-20 bolts. Before tightening press the
retainer onto the panel firmly. Tighten them
once the panels seems to be in the correct
position. (See Figure 36)
Figure 34. Firebox liner preperation
Figure 36. Liner panel retainers
Figure 35. Liner panel position
30
Summary of Contents for Nova Q2
Page 35: ...35 Parts Diagram 2 3 1 18 19 17 16 11 10 13 12 23 15 22 4 9 21 6 5 7 20 8 14 ...
Page 36: ...Notes 36 ...
Page 37: ...Notes 37 ...