11.4.1 Additional BA level parameters that can be configured
(available with
→
enabled)
Display
Description
Selections
available
DT - Adjustment of obstacle recognition time [s/100]
10 - Minimum
60 - Maximum
NB: the parameter is adjusted in hundredths of a second.
20
ST - Adjustment of start time [s]
0.5 - Minimum
3.0 - Maximum
2.0
TA - Adjustment of acceleration time during opening [s]
0.5 - Minimum
9.9 - Maximum
TQ - Adjustment of acceleration time during closure [s]
0.5 - Minimum
9.9 - Maximum
See paragraph 11.2.1
VM - Initial movement speed
[V]
00 - Minimum
15 - Maximum
See paragraph 11.2.1
TD - Adjustment of deceleration time [%]
Adjusts the deceleration ramp slope
10 - Minimum
99 - Maximum
50
OB - Setting of deceleration time during opening [s]
Indicates the time between the start of the deceleration ramp and
the end of the opening stroke
00 - Minimum
30 - Maximum
10
CB - Setting of deceleration time during closing [s]
Indicates the time between the start of the deceleration ramp and
the end of the opening stroke
00 - Minimum
30 - Maximum
10
PO - Adjustment of approach speed during opening [V]
Indicates the speed from the end of the deceleration ramp to the
end of the opening stroke
03 - Minimum
10 - Maximum
NB: gradually increase the approach speed if there is a series of
quick vibrations (chattering) in heavy gates installed with a slight
incline.
See paragraph 11.2.1
PC - Adjustment of approach speed during closing [V]
Indicates the speed from the end of the deceleration ramp to the
end of the closing stroke.
03 - Minimum
10 - Maximum
See paragraph 11.2.1
OO - Obstacle detection limit during opening [%]
Indicates the percentage of the distance travelled during
→
or after the detection of the opening limit switch
→
→
on which the disengagement is deactivated.
NB: not active if
→
→
or if
→
→
.
99
BA
See paragraph 11.2.1