
Completing the Installation
3-24 Installation
Completing the Installation
Completing
the
DFE module
installation
depends
on
if
the
module
is
being
installed
in:
•
a
new
DFE module
system
(refer
to
“Completing
the
Installation”
on
page 3
‐
24),
or
•
an
established,
operating
DFE module
system
(refer
to
“Completing
the
Installation
of
a
DFE
‐
Gold
Module
in
an
Existing
System”
on
page 3
‐
26).
Completing the Installation of a New System
In
a
new
system
of
DFE modules,
one
of
the
installed
DFE modules
will
become
the
management
module
on
chassis
power
up,
and
all
DFE modules
will
automatically
be
set
to
the
factory
default
values.
A
complete
list
of
the
factory
default
values
are
provided
in
Chapter
3
of
the
Enterasys
Matrix
DFE
‐
Gold
Series
Configuration
Guide
.
After
installing
all
DFE modules
into
the
host
chassis
and
making
the
connections
to
the
network,
proceed
to
“First
‐
Time
Log
‐
In
Using
a
Console
Port
Connection”
on
page 3
‐
25
to
access
the
module
management
startup
screen
from
your
PC,
terminal,
or
modem
connection.
Modem Port Adapter Wiring and Signal Diagram
RJ45
DB25
Pin
Conductor
Pin
Signal
1
Blue
2
Transmit (TX)
2
Orange
8
Data Carrier Detect (DCD)
4
Red
3
Receive
5
Green 7
Ground
(GRD)
6
Yellow
20
Data Terminal Ready (DTR)
8
Gray
22
Ring Indicator
RJ45 Connector (Female)
8
1
Pins
DB25 Connector (Male)
13
1
Pins
14
25
Summary of Contents for 6H308-48
Page 2: ......
Page 12: ...x...
Page 16: ...xiv...
Page 56: ...Completing the Installation 3 28 Installation...
Page 70: ...Regulatory Compliance A 4 Specifications...
Page 88: ...PoE Port Status LEDs C 4 About PoE Power over Ethernet...