Installing and Connecting a Redundant Power System
Enterasys 800-Series Hardware Installation Guide 2-29
08A-RPS-500
The 08A-RPS-500 provides power backup to an Enterasys PoE-compliant 800-Series switch. If for
some reason the switch looses power from its internal power supply, the 08A-RPS-500 can provide
up to 500 watts maximum operating power to support switch operation and the 48 Vdc necessary
to support 48 Vdc/data connections to PDs (Powered Devices).
shows the front and rear view of the 08A-RPS-500 power supply.
Figure 2-23 08A-RPS-500 (front and rear view)
The 08A-RPS-500 is shipped with the following:
•
AC power cord
•
RPS cable (1 meter in length)
•
Four rubber feet (for flat surface installation)
•
Two rack mount brackets
•
Eight flathead screws (M3x6)
Installing the 08A-RPS-500
You can install the 08A-RPS-500 on a flat surface or in a 19-inch rack.
Locate the 08A-RPS-500 within 152 cm (5 ft) of its power source.
Rack Mounting the 08A-RPS-500
To install the 08A-RPS-500 in a 19-inch rack, you need:
•
Two rackmount brackets and mounting screws (rackmount kit) shipped with the
08A-RPS-500.
•
Four customer-supplied screws to attach the 08A-RPS-500 to a standard 19-inch rack.
To install an 08A-RPS-500 in the shelf:
1. Attach the rackmount brackets to the 08A-RPS-500, as shown in
, using the eight
M3 x 6 mm flathead screws shipped with the 08A-RPS-500.
1
08A-RPS-500 (front view)
4
08A-RPS-500 (rear view)
2
LED status indicator
5
Air vents for cooling
3
Redundant Power Supply connector
6
AC power input connector
Summary of Contents for 08G20G2-08
Page 2: ......
Page 12: ...x...
Page 20: ...Getting Help xviii About This Guide...
Page 28: ...Features 1 8 Introduction...
Page 70: ...Completing the Installation 2 42 Installation...
Page 78: ...Removing the Switch from a Rack 3 8 Troubleshooting...