Mounting the 8 Port Switches
2-10 Installation
Figure 2-8 Rack Mount Kit with Dual 08G20G2-08Ps and Two Optional RPSs
Connecting Power, Console, and Network Cables
Once the assembled rack mount kit is attached to your rack location, proceed to:
•
Connect power to the switch(es) by plugging each AC power cord into a dedicated, grounded
•
Attach console cable(s). Refer to “
Connecting to the Console Port for Local Management
page 2-32 for more information.
•
Attach network cables. Refer to “
information.
Installing the Switch Under a Table
The following section explains how to install the 08G20G2-08 and08G20G2-08P switches under a
table using the optional table mount kit (D2-TBL-MNT).
1
Optional RPS
3
RPS IN power receptacles
2
800-Series switch (Dual 08G20G2-08Ps shown)
Caution:
The table location and rack mounting screws/anchoring method that the installer selects
for mounting the switch must be capable of supporting 60 lbs (27.2kg).
Summary of Contents for 08G20G2-08
Page 2: ......
Page 12: ...x...
Page 20: ...Getting Help xviii About This Guide...
Page 28: ...Features 1 8 Introduction...
Page 70: ...Completing the Installation 2 42 Installation...
Page 78: ...Removing the Switch from a Rack 3 8 Troubleshooting...