Installation and Operation Manual - COMTEC
®
6000 ATEX GasEx
Installation
Doc.-ID: COMGAS_11022020_EN
37
Adjustment of the Probe Filter Head V-Shield
2.9
Info
Ascertain the flow direction of the process gas at the place of installation.
Unscrew the retaining ring
(clockwise) with a hook wrench
Turn the filter head
into the
correct position
with a pin wrench
Adjust the position of the shield
against the flow direction
Tighten the retainer ring
after
adjusting the filter head
Figure 9 -
Adjustment of the probe filter head in the flue gas
Mounting the protection tube at the flange
2.10
Info
Use for the installation of the probe only new and undamaged gasket.
Tighten the nuts firmly, to guarantee the density of the flange connection. Isolate the counter flange. Never leave
the probe unheated in the running process for longer time.
: Adapter plate
: Protection tube
: Protection tube flange gasket
: Connection box
: O2/COe probe
: Probe flange gasket
: Probe flange
Figure 10 -
Mounting of the protection tube at the mounting flange