77
Operating and maintenance instructions for the ventilation unit
SAFETY
General information
Electrical safety
Always check that the supply voltage to the
equipment is switched off before opening the
service hatch.
Only an authorised electrician may open the
electrical box.
In case of a malfunction, always determine the
reason for the malfunction before restarting the
unit.
When you have switched off the power to the
unit, wait for two (2) minutes before starting the
maintenance work. Even though the power is
switched off, the fans continue running and the
post-heating coil remains hot for a while.
DANGER
DANGER
WARNING
WARNING
If you need technical support, please check the
equipment type and serial number from the type plate.
TYPE PLATE
Summary of Contents for eWind Pelican
Page 24: ...24 2016 1254 2014 ENERGIA ENERGIJA ENERGY ENERGIE ENERGI PELICAN A 44 dB 374 m3 h...
Page 25: ...25 Ilmanvaihtolaitteen k ytt ja yll pito ohje...
Page 26: ...26 Pelican eWind Drift och underh llsanvisningar f r ventilationsaggregatet Svenska...
Page 48: ...48 2016 1254 2014 ENERGIA ENERGIJA ENERGY ENERGIE ENERGI PELICAN A 44 dB 374 m3 h...
Page 49: ...49 Drift och underh llsanvisningar f r ventilationsaggregatet...
Page 50: ...50 Pelican eWind Drift och underh llsanvisningar f r ventilationsaggregatet Norsk...
Page 72: ...72 2016 1254 2014 ENERGIA ENERGIJA ENERGY ENERGIE ENERGI PELICAN A 44 dB 374 m3 h...
Page 73: ...73 Drifts og vedlikeholdsinstrukser for ventilasjonsenheten...
Page 74: ...74 Pelican eWind Operating and maintenance instructions for the ventilation unit English...
Page 96: ...96 2016 1254 2014 ENERGIA ENERGIJA ENERGY ENERGIE ENERGI PELICAN A 44 dB 374 m3 h...
Page 97: ...97 Operating and maintenance instructions for the ventilation unit...
Page 98: ......
Page 99: ......