![EnerPro EPA1050 Installation And Operation Manual Download Page 13](http://html1.mh-extra.com/html/enerpro/epa1050/epa1050_installation-and-operation-manual_2411383013.webp)
The EPA and EPAW models are packaged in an enclosure having identical exterior dimensions. The unit must be installed
with the prescribed clearances for service as shown in Figure ****. The minimum clearance dimensions, required by EPA
and EPAW are listed below. However, if Local Building Codes require additional clearances, these codes shall supersede
EnerPro Boilers requirements. Minimum acceptable clearances required are as follows:
Front
24”
12”
Back
Top
Right
Left
12”
6”
12”
All gas piping, water piping and electrical conduit or cable must be arranged so that they do not interfere with the
removal of any panels, or inhibit service or maintenance of the unit.
EPA Series -
Installation and Operation Manual
13
EnerPro Boiler-EPA Series-
IOM
Summary of Contents for EPA1050
Page 40: ...EPA Series Installation and Operation Manual 40 EnerPro Boiler EPA Series IOM...
Page 41: ...EPA Series Installation and Operation Manual 41 EnerPro Boiler EPA Series IOM...
Page 42: ...EPA Series Installation and Operation Manual 42 EnerPro Boiler EPA Series IOM...
Page 43: ...EPA Series Installation and Operation Manual 43 EnerPro Boiler EPA Series IOM...
Page 44: ...EPA Series Installation and Operation Manual 44 EnerPro Boiler EPA Series IOM...
Page 45: ...EPA Series Installation and Operation Manual 45 EnerPro Boiler EPA Series IOM...
Page 46: ...EPA Series Installation and Operation Manual 46 EnerPro Boiler EPA Series IOM...
Page 47: ...EPA Series Installation and Operation Manual 47 EnerPro Boiler EPA Series IOM...
Page 48: ...EPA Series Installation and Operation Manual 48 EnerPro Boiler EPA Series IOM...
Page 52: ...EPA Series Installation and Operation Manual 52 EnerPro Boiler EPA Series IOM...
Page 57: ...EPA Series Installation and Operation Manual 57 EnerPro Boiler EPA Series IOM...