![EnerPro EPA1050 Installation And Operation Manual Download Page 11](http://html1.mh-extra.com/html/enerpro/epa1050/epa1050_installation-and-operation-manual_2411383011.webp)
EPA Series -
Installation and Operation Manual
11
EnerPro Boiler-EPA Series-
IOM
3. Lighting and Operating Instructions
For your safety, read before operating
Warning
If you do not follow these instructions exactly, a fire or
explosion may result causing property damage, personal
injury or loss of life.
A. This appliance does not have a pilot. It is equipped
with an ignition device which automatically lights the
burner. Do not try to light the burner by hand Consult
burner manual as supplied.
B. BEFORE OPERATING smell all around the appliance
area for gas. Be sure to smell next to the floor because
some gas is heavier than air and will settle on the floor.
What to do if you smell gas
• Do not try to light any appliance.
• Do not touch any electric switch; do not use any phone
in your building.
• Immediately call your gas supplier from a neighbor’s
phone. Follow the gas supplier’s instructions.
• If you cannot reach your gas supplier, call the fire
department.
C. Use only your hand to push in or turn the gas control
knob. Never use tools. If the knob will not push in or
turn by hand, don’t try to repair it: call a qualified
service technician. Force or attempted repair may
result in a fire or explosion.
D. Do not use this appliance if any part has been under
water. Immediately call a qualified technician to inspect
the appliance and to replace any part of the control
system and any gas control which has been under
Start-up procedure
• Inspect for proper baffling insertion into flue passes. All clean out doors properly sealed. Burner flange closed and
properly bolted.
• Gas and oil systems ready. Proper vent connections. Required combustion and ventilation air provided.
• Waterside of system properly filled and vented of air.
• Lighting instruction followed.
• To be performed by a licensed tradesperson in accordance with the guidelines shown in this manual. Follow burner
manufactures instructions.
• Mandatory factory start-up report to be completed and returned to comply with the warranty process.
• Proper operating instructions of equipment to be related to operating personnel.
Shut-down procedure
• Disengage all electrical power switches to heating system burners, pumps. Isolate all boiler valves and fuel valves.
• For off-season shutdown, open boiler combustion flue passages and clean. Ensure venting, chimney, combustion
and ventilation air openings free from blockage. Do not drain waterside of system.
Summary of Contents for EPA1050
Page 40: ...EPA Series Installation and Operation Manual 40 EnerPro Boiler EPA Series IOM...
Page 41: ...EPA Series Installation and Operation Manual 41 EnerPro Boiler EPA Series IOM...
Page 42: ...EPA Series Installation and Operation Manual 42 EnerPro Boiler EPA Series IOM...
Page 43: ...EPA Series Installation and Operation Manual 43 EnerPro Boiler EPA Series IOM...
Page 44: ...EPA Series Installation and Operation Manual 44 EnerPro Boiler EPA Series IOM...
Page 45: ...EPA Series Installation and Operation Manual 45 EnerPro Boiler EPA Series IOM...
Page 46: ...EPA Series Installation and Operation Manual 46 EnerPro Boiler EPA Series IOM...
Page 47: ...EPA Series Installation and Operation Manual 47 EnerPro Boiler EPA Series IOM...
Page 48: ...EPA Series Installation and Operation Manual 48 EnerPro Boiler EPA Series IOM...
Page 52: ...EPA Series Installation and Operation Manual 52 EnerPro Boiler EPA Series IOM...
Page 57: ...EPA Series Installation and Operation Manual 57 EnerPro Boiler EPA Series IOM...