SERVICE INPUTS
This menu is used to view all inputs into the system.
DIGITAL INPUT STATUS
All digital inputs into the controller can be monitored here.
ANALOG INPUT STATUS
All analog inputs into the controller can be monitored here.
TEMPERATURES
When temperature/RH sensors are enabled, all temperatures read by the
controller can be monitored here.
RELATIVE HUMIDITIES
When temperature/RH sensors are enabled, all relative humidities read by the
controller can be monitored here.
SERVICE OUTPUTS
This menu is used to view all outputs into the system.
DIGITAL OUTPUT STATUS
All digital outputs from the controller can be monitored here.
ANALOG OUTPUT STATUS
All analog outputs from the controller can be monitored here.
RESET FAULTS
When a critical fault occurs, the fault can be manually reset via this menu.
TEST MENU
Various features and components can be tested and controlled via the test menu. Once
the test menu is entered, standard unit operation will be stopped until the service
interface menu has been exited. The test menu will automatically timeout after 60
minutes of being idle.