U-ERV/U-HRV
INSTALLATION
MECHANICAL
– DUCTWORK
It is highly recommended to A) section the duct that connects to the system with (2) 14” minimum duct
sections, or B) provide access panels within the sides of the duct to allow the system to be easily
serviced. An example of each duct connection recommendation for an 1800 system is shown below.
A
*
*TO SERVICE A FAN WITHIN DUCT, REMOVE DUCT “2”, FOLLOWED BY DUCT “1”. ENSURE DUCT “3” IS
INDEPENDENTLY SUPPORTED AND DOES NOT RELY ON THE SYSTEM FOR SUPPORT.
B
**
**A WATER-TIGHT ACCESS PANEL CAN BE INSTALLED IN THE LOCATION AND SIZE SPECIFIED WITHIN
THE DUCT TO SERVICE A FAN.
14” MIN
14”
6
”
14”
6
”
14” MIN
1
2
3
1
2
3