![Energy Wall U-ERV 1200 Installation, Operation & Maintenance Manual Download Page 27](http://html1.mh-extra.com/html/energy-wall/u-erv-1200/u-erv-1200_installation-operation-and-maintenance-manual_2410756027.webp)
ENERGYWALL.COM
INSTALLATION, OPERATION & MAINTENANCE MANUAL 717.814.5365
25
ENERGY WALL
TM
U-ERV/U-HRV
COIL MODE SETPOINTS
All setpoints related to coil control are currently being developed and will be released
in the next version of software.
OPERATIONAL SETTINGS
All configurable settings related to the operation of the unit can be found within this menu.
SCHEDULE SETTINGS
All settings to set an onboard schedule for the system can be found within this menu.
SET SCHEDULE A/B
There are two different 7-day schedules that can be set to put the unit into an
occupied or unoccupied state. Adding a schedule will enable the use of
various setpoints for each schedule state.
FAN MODE
There are 5 modes to control the supply and exhaust fans when the unit is enabled as
defined below.
MANUAL
When fan mode is set to manual, the supply and exhaust fans will operate
independently at fixed speeds as defined in the fan control setpoints menu
when the system is enabled. When scheduling is enabled, an occupied and
unoccupied setpoint can be set.
ANALOG
When fan mode is set to analog and the system is enabled, the supply and
exhaust fans will modulate linearly between a minimum and maximum
setpoint for each airstream as defined in the fan control setpoints menu. Each
airstream has its own 0-10VDC input and can modulate independent from the
other. To modulate the supply and exhaust airstreams from one input signal,
the input signal can be jumped across terminals as defined in the electrical
schematics. When scheduling is enabled, occupied and unoccupied supply
and exhaust minimum and maximum setpoints can be set.
OPERATION
MENU DESCRIPTIONS