10
4-c
. CONNECT VENTING (continued)
(3) Install vent piping.
(4) When configuring the ESC for Power
Vent (indoor combustion air) install a 45
°
vent elbow, pointing downward.
(5) Install vent terminal and seal around all
exterior openings.
(6) The final installation should appear as in
Figure 4-c.
4.
For vertical venting, follow instructions in
Appendix B2
Direct Venting, Special
Instructions for Stainless Steel Venting
Vertical Installations,
Specifically,
(1) Install fire stops and wall thimbles.
(2) Install vent piping and vert terminal.
(3) Install condensate line.
(4) Install roof flashing and roof supports.
(5) The final installation should appear as in
Figure B-7 in
Appendix B-2
.
Summary of Contents for ESC
Page 6: ... Figure S 1 Minimum Clearances to Combustibles SPECIFICATIONS continued ...
Page 30: ...30 Internal Wiring Figure IW 1 Wiring Diagram ...
Page 31: ...31 Internal Wiring continued Figure IW 2 Wiring Diagram ...
Page 37: ...37 APPENDIX B1 INTENTIONALLY OMITTED ...
Page 50: ...50 Figure D 0 Piping Schematic Symbols APPENDIX D System Piping continued ...
Page 62: ...62 SERVICE RECORD DATE SERVICE PERFORMED ...