protection 

equipment 

that 

meets 

the 

requirements. 

  When 

professionals 

replace 

or 

repair 

photovoltaic  modules,  do  not  damage  the 
surrounding  photovoltaic  modules  or  their 
support structures. 

  When cleaning photovoltaic modules, you must 

follow the cleaning requirements of photovoltaic 
modules.   

  The connectors must be kept dry and clean to 

ensure that they are in good working condition. 
Do  not  insert  other  metal  objects  into  the 
connector or make electrical connections in any 
other way. 

5  Handling and unpacking 

If  the  photovoltaic  module  is  not  in  use,  please  do 
not open the product packaging. The goods should 
be stored in a dark, dry and ventilated place. If the 
photovoltaic modules are stored in an uncontrollable 
environment,  the  storage  time  must  be  less  than  3 
months when the outer packaging of the photovoltaic 
modules is kept intact. 

It  is  recommended  to  take  appropriate  amount  of 
photovoltaic modules for unpacking according to the 
project  progress  every  day,  and  the  unpacked 
photovoltaic  modules  should  be  installed  within  a 
day.  After  unpacking,  the  photovoltaic  modules  are 
stacked  on  the  ground.  In  severe  weather  such  as 
heavy  rain,  the  photovoltaic  modules  may  be 
immersed  in  water  for  a  long  time  and  affect  the 
reliability of the product. In severe weather such as 
typhoons, photovoltaic modules that have not been 
installed may also be scraped away. 

5.1  Transport 

When  the  photovoltaic  modules  are  transported  to 
the  project  site,  they  must  be  transported  in  the 
packaging  box  provided  by  8  Star  Energy,  and 
should be stored in the original packaging box before 
installation.  Please  protect  the  packaging  from 
damage. 

It  is  necessary  to  protect  the  safety  of  photovoltaic 
modules  when  unloading,  especially  when  hoisting 
roof  projects.  It  is  forbidden  to  use  lifting  straps 
directly  on  the  pallet  for  hoisting.  The  photovoltaic 
modules should be placed in a protective device and 
then hoisted to the roof to prevent the packing box 
from  deforming  and  bumping  against  any  walls 
during the hoisting process. 

Due  to  the  limitation  of  the  height  of 
the  container,  when  the  photovoltaic 
modules  are  removed  from  the 

container,  the  distance  between  the  upper 
surface  of  the  forklift  tines  and  the  ground 
should be less than 80mm, otherwise collisions 
may  easily  occur,  which  may  damage  the 
photovoltaic modules. 

5.2  Unpacking 

When  unpacking,  you  need  to  tear  the  stretch  film 
first,  then  use  a  knife  to  cut  the  binding  tape,  and 
remove the packing box cover. 

If the inner packaging is fixed with anti-falling tape, a 
group of two should hold the frame with both hands 
in  the  same  direction  and  take  out  the  photovoltaic 
modules  one  piece  at  a  time,  and  remove  the 
photovoltaic  module  by  tearing  off  a  piece  of  fixing 
glue. The photovoltaic modules in the box will fall; if 
the internal packaging is fixed by the internal packing 
belt,  first  cut  the  internal  packing  belt,  use 
anti-inverted sticks and other non-sharp and reliable 
items  to  hold  one  side  of  the  long  side  frame,  and 
then cut the other side. Two people can then move 
and  take  out  the  photovoltaic  modules  one  by  one 
around the frame; the whole handling process needs 
to be handled with care, and you must make sure to 
not collide with any hard objects or allow any part of 
the frame to touch the ground or be dragged. 

5.3  Stacking of photovoltaic modules 

When  taking  out  the  photovoltaic  module  from  the 
packing  box,  you  need  to  lay  the  cardboard  on  the 
ground first to prevent the photovoltaic module from 

Summary of Contents for Beam Series

Page 1: ...ilicon PV Modules Installation Manual Version 1 0 Released in November 2021 This guide describes how to install the Energizer Solar Beam crystalline silicon PV modules To prevent improper operation be...

Page 2: ...nergy ESS Ltd The Black Church St Mary s Place Dublin DO7 P4AX Ireland 1 Table of contents 1 Table of contents 2 2 Important notes 3 3 Laws and regulations 3 4 Safety measures 3 5 Handling and unpacki...

Page 3: ...ntrol of 8 Star Energy Proprietary Limited hereafter 8 Star Energy this manual does not have any warranty meaning whether express or implied 8 Star Energy will not be responsible for any form of injur...

Page 4: ...ive oil bone setting water thinner adhesive sheets that can generate oxime gas and potting glue only for connectors Such as KE200 CX 200 chemlok etc TBP plasticizer detergent etc to avoid chemical dam...

Page 5: ...voltaic module and the installation surface should be kept to prevent the installation surface from touching the junction box When installing on the roof comply with the fire protection requirements o...

Page 6: ...he original packaging box before installation Please protect the packaging from damage It is necessary to protect the safety of photovoltaic modules when unloading especially when hoisting roof projec...

Page 7: ...e system design requirements the color of photovoltaic modules in the same row or square array should be the same 6 Mechanical installation 6 1 Installation conditions Recommended ambient temperature...

Page 8: ...a third party testing organization with static mechanical analysis capabilities to meet the country region or corresponding international standards The photovoltaic module must be firmly fixed on the...

Page 9: ...gure 4 or Figure 5 The 400mm pitch mounting hole size is 7x10mm and 4 x M6 stainless steel bolts are required Figure 5 Secure each bolt to the frame with stainless steel washers one for each side of t...

Page 10: ...ar PV modules otherwise this may affect the modules operation or performance Be sure to avoid shadowing effects from the module clamps Weep holes on the module frame must not be closed or obscured by...

Page 11: ...stallation method Figure 2 3 Fig 4 Fig 7 Fig 8 Fig 5 ENSP60M1 ENSP60M1 BL 1755 1038 30 1765 1048 35 1755 1038 30 1765 1048 35 5400Pa 2400Pa 5400 2400Pa Installation scope 400 50mm 1800 1800Pa Installa...

Page 12: ...nditions a photovoltaic module is likely to experience conditions that produce more current and or voltage than reported at standard test conditions Accordingly the value of Isc marked on this module...

Page 13: ...ng coil and wire clip must be used to fix it on the bracket Avoid direct sunlight and water soaking cables Please keep the connector dry and clean and make sure that the nut of the connector is tighte...

Page 14: ...Note that the copper wire cannot be attached directly to the aluminum Put the bolt through the cut washer and then through the hole in the aluminum frame Add the spring washer and nut on the other si...

Page 15: ...t necessary to clean the PV module rain will have a self cleaning effect If there is a lot of dirt on the surface of the photovoltaic module which has seriously affected the power generation use water...