GB
IE
14
Fitting the head stock and motor
Locate the two grub screws
in the side of the
head stock and motor assembly. Using a
hexagonal key slacken the two grub screws.
Lift the head stock and motor assembly and
lower it onto the column(. Make sure that it
slides down and locates fully on the column.
Position the head stock and motor assembly
ensuring it is aligned with the base plate(7).
Tighten the two grub screws to secure the
head stock and motor assembly into place(Fig.5).
Retain the hexagonal keys for future adjustments.
Fitting the hand feed handles
Locate and install the three hand feed handles(3).
Simply screw the handles
into the three
(3)
threaded holes located in the feed shaft boss.
Make sure that all three handles
are tight
.
(3)
(Fig.6)
Fitting the chuck guard
without the chuck guard(4) fitted.
The telescopic chuck guard
is partially
(4)
assembled onto the machine.
Remove three cross head screws just
below the hinge on the red collar.
Position the transparence plastic shield into the
red collar and secure in place with the three
small cross head screws
. The chuck
(Fig.7-1)
guard
(4)
is spring loaded and on a hinge which
allows the guard
to be moved upwards to
(4)
expose the chuck
for drill installation and
(9)
Warning:never attempt to use the machine
Before you start
Fig.5
13
Fig.6
Fig.7-1
Fig.7-2
G
e
tt
in
g
s
ta
rt
e
d
..
.
ENB540DBT by
ENERGER
3
Summary of Contents for ENB540DBT
Page 2: ......
Page 5: ......
Page 6: ......
Page 12: ......
Page 16: ......
Page 21: ......
Page 26: ...26 Care and maintenance GB IE In more detail Blue 13 ENB540DBT by ENERGER...
Page 31: ...31 Guarantee GB IE In more detail ENB540DBT by ENERGER...
Page 32: ...EC declaration of conformity 32 ENB540DBT by ENERGER...
Page 33: ...Powersmith UK LTD Trade House Mead Avenue BA22 8RT GB...