120430
25
All brands and logos are registered trademarks of their respective owners
POWER MANAGEMENT SYSTEM - LAN
Choose the date and time of the scheduled event. If you wish
the events to be executed periodically then check the
Loop
option and set the loop period. To commit your changes, press
the
Apply
button. To delete the entered schedule, press the
Clear schedule
button.
Note:
The hardware schedule keeps running even when the device is
powered off. However it is recommended not to power off the device
for extended periods as the built-in battery has a limited lifespan. If the
battery dies, the schedule will be completely cleared. The total lifetime
of the battery is no less than 2 years if the device is powered off, and
no less than 5 years if the device is powered on.
4.4. Socket Name settings page
On the
Socket name settings
page (see Figure 9 below) you
can assign suitable names to the sockets. These names will be
shown on the
EnerGenie
page and on the
Socket
pages.
Note:
The maximum socket name length is 11 characters.
Hint:
Identify your socket with the equipment which is plugged in.
Summary of Contents for PMS-LAN
Page 1: ......