The sockets:
Socket 1, Socket 2, Socket 3 and Socket 4
can
be managed or pre-programmed by computer via the LAN
connection. They are called
manageable sockets
in this
manual.
The manageable sockets of the PMS-LAN can be
programmed to be on or off. The current status of each
manageable socket is represented by the corresponding
indicator which will be lit if socket has power to it.
If the
Main rocker switch (Z)
(Figure 1 above) is turned off
then the manageable sockets cannot be switched on by either
the
Power manager
software or the hardware schedule.
When the
Main rocker switch (Z)
is switched on, the
Power
Manager
software or the hardware schedule will also be
enabled. The manageable sockets can then be switched on
and off.
Master switch button (B)
(see Figure #2 above) can also
switch all the manageable sockets on and off regardless of
their current status or schedule that is being executed. To
switch them on you should keep the button pressed for 1-2
seconds. To switch them off you should keep the button
pressed for more than 3 seconds.
To protect the connected devices from possible high current
and short circuit, the PMS-LAN is equipped with an automatic
circuit breaker.